117
LEADING IN PRODUCTION EFFICIENCY
Operating Manual
© Dürr Systems AG
ED3K_Operating_Manual_Rev02LD_03Lug2020_EN. docx
Rev.02 – 03.07.2020
9.2 Fluidic panel
Complete “fluidic panel”
Coriolis version
Gear version
Daily inspect fluidic panel for visible damage.
C.C. Valves
Eco
MCC3
EcoValve7 20
EcoMCC 200
C.c valves should be inspected periodically following the manufacturer's instructions (attached to this
manual).
The valve activity is controlled by the PLC, and if the number of switching operations carried out
exceeds the programmed value, the display shows the following message: "MAXIMUM NUMBER
OF PULSES ACHIEVED, PROVIDE MAINTENANCE".
When the message appears, you must replace the valve as soon as possible
“Coriolis” flowmeter
“Coriolis”
mass flowmeters do not need any maintenance in
addition to the normal calibration tests to ensure the suitable
conditions.