9.7
Assemble valve
Up to two valves are installed in the valve block.
- Purge valve
- Valve for recirculation
The assembly procedure is identical for both the valves.
Prerequisites:
- All channels controlled by the valve are rinsed and dry.
- The valve block was removed.
- The atomizer body was removed.
- The sleeve was removed.
The valve is located in the valve block.
Fig. 93: Position of valve
1
Valve
A faulty valve must be replaced with a new valve. A repair is not
possible.
9.7.1
Removing the valve
• Use a socket wrench to unscrew the valve from the component.