![Dorner AquaPruf 7400 Ultimate CE Series Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/dorner/aquapruf-7400-ultimate-ce-series/aquapruf-7400-ultimate-ce-series_installation-maintenance-and-parts-manual_2523190012.webp)
Dorner Mfg. Corp.
12
851-638 Rev. E
7400 Series CE End Drive Conveyors
Installation
Nose Bar Idler Tail
Typical Nose Bar Idler Tail Components
Figure 23
1.
Slide the nose bar idler shaft hands
into the take up blocks
.
Figure 24
2.
Attach the nose bar transfer post
to
the nose bar idler shaft hands.
3.
Ensure that the nose bar pucks
are
in line with the conveyor frame
.
Figure 25
Nose Bar Tip Up Tail
Typical Nose Bar Tip Up Tail Components
Figure 26
NOTE
Do not insert the pull pins on the tension end
of the conveyor until the belt has been
installed.
1
Nose bar idler tail assembly
2
Pull pin (x2)
3
Conveyor frame
1
2
3
1
2
3
2
1
3
NOTE
Do not insert the pull pins on the tension end
of the conveyor until the belt has been
installed.
1
Tip up tail assembly
2
Pull pin (x2)
3
Tip up shaft
4
Key stops (x2)
2
1
1
8
0˚
2
4
1
3