![Dorner 2200 series Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/dorner/2200-series/2200-series_installation-manual_2523129007.webp)
851-583 Rev. E
7
Dorner Mfg. Corp.
2200 Series Gang Drive Conveyors
Installation
7.
Install mounting brackets and return rollers. Refer to
“Mounting Brackets” on page 7 and “Return Rollers” on
page 7.
8.
If equipped with cam tracking assemblies (Figure
3, item I), reposition and adjust belt tracking. Refer to
“Conveyor Belt Tracking” on page 10.
Mounting Brackets
1.
Locate mounting bracket assemblies. Exploded views
are shown in Figure 7.
Figure 7
Figure 7
2.
Remove screws (Figure 7, item N and O), washers (P),
nuts (Q) and T-bars (R) from brackets.
3.
Insert T-bars (Figure 7, item R) into conveyor side slots
(Figure 8, item S). Fasten brackets (T) to conveyor and
T-bars (R) with mounting screws (N).
Figure 8
Figure 8
4.
Fasten brackets to support stand with mounting screws
(O), washers (P) and nuts (Q).
5.
Tighten screws (N and O) to 60 in-lb (7 Nm).
Return Rollers
2” (51mm) through 6” (152mm) Wide
Conveyors
1.
Locate return roller assemblies. Exploded views are
shown in Figure 9.
Figure 9
Figure 9
2.
Remove screws (Figure 9, item U) and clips (V) from
roller assembly.
3.
Install roller assemblies (Figure 10, item W) as shown.
Tighten screws (U) to 60 in-lb (7 Nm).
Figure 10
Figure 10
8” (203mm) through 24” (610mm) Wide
Conveyors
1.
Locate return roller(s). Exploded view is shown in
Figure 11.
Figure 11
Figure 11
2.
Remove screws (X) and clips (Y) from roller assembly.
3.
Install roller assembly (Figure 12, item Z) as shown. On
each side of conveyor, tighten screws (X) to 60 in-lb (7
Nm).
Figure 12
Figure 12
N
R
Q
P
O
P
O
S
N
T
Q
U
V
U
V
U
W
W
X
Y
X
Y
X
Z