Trim installation / Start-up
use this checklist to verify that you have all the information you need for the trim installation and initial start-up of SeNSORY SKY
ATT
.
The following items are particularly important:
Flushed pipes prior to trim installation
Checked power supply in sub distribution board
Checked parts supplied for trim installation are complete
Installed product immediately after opening the box
Installed complete SENSORY SKY
ATT
: rain panel, hand shower set, control elements, fragrance modules
Installed fragrance modules in accessible area
Installed power supply cables (NYM 3 x 1.5 mm²) in sub-distribution board
Checked power supply at the fragrance modules (230 V AC)
Checked power supply (output) at the ceiling installation enclosure for rain panel (12 V DC)
Installed the terminating resistor (Terminator) on the last element in the loop connected via connecting cables
(fragrance control unit)
Installed specification label in sub distribution board (e.g. door electrical cabinet)
Installed three power supply units, fragrance control module, DC Filter and AC filter in sub distribution board
Installed Ethernet cable (coming from SENSORY SKY
ATT
) in sub-distribution board
Shutoff for the hot and cold water pipes opened all the way
Turned on power supply
Installed three fragrance bottles, filled pumps manually for start-up until tubes are completely filled (installed reserve
bottles if necessary)
Checked all functions of SeNSORY SKY
ATT
Instructed owner/ operator in use of SeNSORY SKY
ATT
Handed over quickinfo and user manual
Confirmed faultless operation with signature
Plumbing / dry wall planning advice
electrical and fragrance planning advice
Plumbing / dry wall rough-in
electrical and fragrance rough-in
Positioning
recommendations
Components
Zones of protection
Pre-wall installation