![Dormakaba Muto Comfort L80 Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/dormakaba/muto-comfort-l80/muto-comfort-l80_installation-instructions-manual_2522915004.webp)
dormakaba MUTO Premium XL150/80/120 / MUTO Comfort L80
Fixed Panel Installation Instructions
MUTO Premium/Comfort Fixed Panel
05-2018
936020
4
Technical specifications
2 Scotch-Weld™ EPX™ Plus II Applicator with 2:1 and 1:1 Plunger is a trademark of 3M.
3 Scotch-Weld™ EPX™ Plus II Mixing Square Nozzle is a trademark of 3M.
1.2
Tempered laminate glass (TLG) and adhesive specifications
Required parts for laminate glass
with MUTO System (not included)
Part Number
Quantity
Usage recommendation
3M™ Scotch-Weld™ Urethane
Adhesive, DP 605 NS
934.800
1 tube
1 tube per 4 roller carriers
3M™ Scotch-Weld™ EPX™ Plus II
Applicator with 1:1 Plunger
2
934.801
1 applicator
1:1 plunger with 934.800
adhesive
3M™ Scotch-Weld™ EPX™ Plus II
Mixing Square Nozzle, 5.3mm
3
934.805
Pk of 4
4 nozzles per 1 tube of
adhesive
MUTO Accessory set (Clamp carrier
plate/gasket for TLG)
807.640
1 set
Handling time frame
Function
Time
Working life
(time between
application and clamping of carrier)
5 minutes @ 75°F
Handling strength
20 minutes @ 73°F or more
Full cure time
(ormal door usage not
recommended until full cure time has
been met)
48 hours @ 73°F or more
NOTE: Door glass should not be installed until the full
cure time as been reached (see chart above).
Important safety-related information for the mounting
and use of dormakaba glass hardware.
1.1
Clean clamping area with alcohol-based
standard commercial cleaning agent before
mounting the glass hardware.
1.2
Never clamp metal glass fitting hardware
directly to glass surface.
1.3
Never use clamping product on surfaces with
self-cleaning coatings.