48
OPERATION
LIGHTSOURCE V9
ENGINE STOPPING
(1) Close service valves.
(2) Before stopping the engine, cool down the engine by operating it at
reduced load about three minutes. In this period, check the engine
noise for abnormalities.
LONG TERM STORAGE
If the equipment is to be out of operation for an extended period, it
should be started at least once per week and run on load for about 15
minutes after it has reached normal operating temperature.
If this is not possible,
Do not drain the cooling water
Clean dust or oil from the engine extension
Either fill completely or drain the fuel tank
Grease accelerator joints and electrical connections
Disconnect the negative battery terminal
Содержание LIGHTSOURCE V9
Страница 3: ......
Страница 4: ......
Страница 18: ...GENERAL INFORMATION 14 LIGHTSOURCE V9 FIXED HEIGHT RUNNING GEAR VARIABLE HEIGHT RUNNING GEAR...
Страница 33: ...MAINTENANCE 29 LIGHTSOURCE V9...
Страница 34: ...ELECTRICAL SYSTEM 30 LIGHTSOURCE V9 SCHEMATIC DIAGRAM FOR AC ELECTRICAL HARNESS...
Страница 35: ...ELECTRICAL SYSTEM 31 LIGHTSOURCE V9 SCHEMATIC DIAGRAM FOR AC ELECTRICAL HARNESS...
Страница 36: ...ELECTRICAL SYSTEM 32 LIGHTSOURCE V9 SCHEMATIC DIAGRAM FOR AC ELECTRICAL HARNESS...
Страница 38: ...ELECTRICAL SYSTEM 34 LIGHTSOURCE V9 SCHEMATIC DIAGRAM FOR DC ELECTRICAL HARNESS...
Страница 64: ......
Страница 65: ......
Страница 66: ......