
- 65 -
LP Engine G430 (3.0L)
Igntion System
EST Distributor Disassembly
(1) Distributor Cap. (2) Distributor rotor. (3) Distributor shaft.
(4) Distributor pickup retainer. (5) Distributor coil.
(6) Distributor pole piece. (7) Distributor module bolt.
(8) Distributor ignition module. (9) Distributor p/u pole pin.
(10) Distributor housing. (11) Distributor shaft gear.
(12) Distributor gear pin.
NOTICE
Do not disassemble distributor unless necessary.
When disassembling distributor, use soft wood blocks
to hold it in a vise.
1. Remove rotor from distributor shaft.
2. Remove module by detaching leads and removing
two mounting screws.
3. Place a mark on the distributor gear in line with rotor
segment so reassembly can be made in same
location.
4. Drive pin from gear. Remove gear and shaft
assembly.
5. Pry off upper retainer and remove pickup coil.
Cleaning and Inspection
1. Wash housing, gear, and shaft in cleaning solvent.
2. Inspect housing, gear, and shaft for wear. Replace
if worn.
3. Inspect wires and connector on pickup coil. Replace
if damaged.
EST Distributor Reassembly
1. Install pickup coil and retainer.
2. Install shaft assembly, two thrust-washers, gear,
and roll pin.
3. Spin shaft to insure that teeth do not touch.
4. Clean module mounting surface of old silicone
grease. Apply clean silicone grease between
housing and module. Silicone grease is necessary
for proper heat dissipation.
5. Install module and two mounting screws.
6. Attach wires from pickup coil to module.
7. Install rotor onto shaft.