6
4.3. CONNECTION OF OPERATOR AND GUIDE
1. Put the operator bushing (4) on the shaft (5).
2. Insert the operator unit into the hole on the
guide (3).
3. Fasten the operator with U-brackets (2) and
tapping screws (1).
1.
Tapping screws
2.
U-bracket
3.
Guide
4.
Bushing
5.
Motor shaft
4.2. REQUIRMENTS TO DOOR INSTALLATION
Prior to installation check if the door is
properly balanced and moves smoothly when
automatically operated.
Make sure, that minimal clearance between
the ceiling and the top point, when the door is
moving, is not less than 45 mm (pic. 1).
Check, that the door leaf top roller is in the
horizontal part of the guide rail, when the door
is completely closed (pic. 2).
Mount the door control panel at a height not less
than 1.5 m close to the door.
Pic. 1
Pic. 2
45 mm
1.
Set of spanners
2.
Set of slotted and cross screwdrivers
3.
Set of drills for metal
4.
Set of drills for concrete
5.
Pliers
6.
Hacksaw for metal
4. OPERATOR INSTALLATION
4.1. TOOLS
7.
Electric drill
8.
Tape measure (folding rule)
5
4
3
1
2
OPERATOR INSTALLATION
Содержание SECTIONAL-500PRO
Страница 16: ...FOR NOTES...
Страница 17: ...FOR NOTES...