background image

8

Donaldson Company, Inc.

Platform and Ladder 

Collector may be equipped with a ladder and platform system for gaining access to the clean air plenum for filter bag changeout. 

For all ladders over 24-ft OSHA requires a ladder safety system or personal fall arrest system. As a convenience, Donaldson offers 

ladder safety systems as an option.

Explosion Relief Panels

Collector may be equipped with optional explosion relief panels to support a process owners combustible dust mitigation strategy. 

Explosion vent sizing follows NFPA-68 formulas assuming outdoor location of collector with no duct or obstruction on the explosion 

vent panels. Contact Donaldson Torit for explosion venting requirements for other conditions.

Sprinkler Coupling 

Sprinkler couplings are provided for the convenience of fire control system installers. The fire control system installer shall make 

their own decisions on the appropriate location of fire control system components.

Water Overflow Valve 

An optional means to allow water evacuation.  Some method of water evacuation must be provided if a water based extinguishing 

system is installed on the collector.

Cleaning Controls and Sensors

Magnehelic

®

 Gauge 

Simple mechanical gauges that measure differential pressure. May be passive mechanical versions or digital, may include 

electrical contacts and user adjustable setpoints. 

Hopper Discharge Accessories 

Hopper Transition 

The collector comes with a standard size hopper outlet. Donaldson offers optional hopper outlet transitions to match up with 

various dust disposal devices.

Live Bottom Hopper

Short section of screw conveyor with a round to rectangle transition that handles tough dusts that bridge easily. 

Rotary Airlock (RAL) 

Used to isolate the dust collection system pressure from atmosphere. Options include flexible wipers, NFPA rated valves, 

Pneumatic conveying ready valves, and high clearance valves for tough to handle dusts. 

Screw Conveyor 

Can be mounted directly to the hopper outlet with the addition of an RAL at the discharge. Useful for loading bulk containers while 

maintaining a shorter overall height. 

Options and Accessories

Содержание 252LP

Страница 1: ...recautions related to worker safety The hazard alert image denotes safety related instructions and warnings in this manual DO NOT install operate or perform maintenance on this collector until you hav...

Страница 2: ...operation and maintenance for the collector purchased Please read the manual before installing operating or performing maintenance on the collector as it contains specific precautions for worker safe...

Страница 3: ...oting 14 Appendix A Installation 16 Location and Site Selection 17 Delivery and Inspection 17 Unloading and Positioning 17 Lifting Information 18 Support Installation 19 Inlet Scroll Installation 19 P...

Страница 4: ...ould comply with applicable codes and standards related to combustible dust Electrical installation must be performed by a qualified electrician This equipment is not designed to support site ducts pi...

Страница 5: ...ty for the fitness of a mitigation strategy or product for a particular installation or application The process owner s final selection of dust collectors and risk mitigation strategies should be base...

Страница 6: ...gle discharge hopper Filters The LP collector ships with filter bags and cages The standard bag media is Dura Life which provides long life and energy savings due to lower pressure drop Other filter b...

Страница 7: ...airflow straightening before it reaches the filters This allows the majority of the dust to drop out into the hopper and the airflow to be evened out before it gets to the filters Hopper The hopper l...

Страница 8: ...verflow Valve An optional means to allow water evacuation Some method of water evacuation must be provided if a water based extinguishing system is installed on the collector Cleaning Controls and Sen...

Страница 9: ...ctly into the hopper The air continues through an internal flow straightener that evenly distributes the dust laden air within the collector cross section and around the filter bags After entering the...

Страница 10: ...10 Donaldson Company Inc Collector Operation scroll inlet dirty air inlet clean air outlet filter access door filter bags and cage hopper...

Страница 11: ...plosion vents Vents are free of obstructions and are mechanically sound and sealed with no evidence of air water or dust leakage Rotary Airlock RAL or discharge device No air bypass during operation a...

Страница 12: ...nward 9 Snap the bag in place with the tube sheet between the upper and lower rings on the filter bag collar 10 Slide the filter cage into the filter bag and seat firmly 11 Repeat steps 8 10 for all r...

Страница 13: ...72LP 252LP Baghouse 13 1 2 4 3 Felt Snap In Filter Installation filter bag filter bag upper ring filter cage tube sheet tube sheet lower ring cage...

Страница 14: ...l until proper airflow is achieved and the blower motor s amp draw is within the manufacturer s rated amps Electrical circuit overload Check that the power supply circuit has sufficient power to run a...

Страница 15: ...for proper flow at product discharge flange on filter hopper Cleaning system Check operation of LP fan Check operation of LP gear box and drive Verify no debris or condensation in tube length running...

Страница 16: ...16 Donaldson Company Inc Appendix A Installation...

Страница 17: ...support framing Note Ensure the inlet has at least five diameters of straight duct prior to the collector inlet including a transition to the full inlet dimensions Inlet transition should have a taper...

Страница 18: ...ded 2 Use clevis connectors not hooks on lifting slings 3 Use spreader bars to prevent damage to equipment 4 Check the Specification Control drawing for weight and dimensions of the collector and comp...

Страница 19: ...es Consult a qualified engineer for final selection of suitable anchors Temporary support is required until all legs and cross bracing are in place Inlet Scroll Installation 1 After the collector hous...

Страница 20: ...ladder and platform components from top to bottom paying close attention to the assembly drawings 5 Make sure that all platform and ladder support brackets are installed and the bottom ladder is secur...

Страница 21: ...d any bracing keeping the cleaning fan from moving Make sure that cleaning arm can move while under power fan assembly drive components sweep arm rotating elbow shaft rotating elbow assembly fan box a...

Страница 22: ...e manually rotated to access some bags 6 Once all bags are installed ensure the cleaning arms rotate smoothly 7 Close the filter access door 1 2 4 3 Filter Bag and Cage Installation filter bag filter...

Страница 23: ...et assembly to the supporting structure using two self drilling screws 5 Thirty five feet of plastic tubing is supplied and must be cut in two sections Connect one section of tubing from the gauge s h...

Страница 24: ...damage when airlock is operating Optional discharge devices may require independent support Discharge devices over 800 lbs must be independently supported Hopper discharge devices must be sized to ha...

Страница 25: ...de buildings and away from normally occupied areas Explosion vents should be inspected regularly to confirm physical and operational condition Replace any damaged parts immediately Standard explosion...

Страница 26: ...ources b Within the junction box swap the connection location of two power leads on the terminal block making certain not to swap a power lead and the ground wire Do not interchange a power lead with...

Страница 27: ...n the operation section to remove as much contaminant from collector as possible 2 Lock Out all energy sources 3 Remove all filters from the collector and dispose of in a suitable fashion for the dust...

Страница 28: ..._________________________________________________________________________________ Dust Properties Kst________________Pmax_______________ MIE_____________ MEC___________________ Accessories____________...

Страница 29: ...72LP 252LP Baghouse 29 Service Notes Date Service Performed Notes...

Страница 30: ...30 Donaldson Company Inc Service Notes Date Service Performed Notes...

Страница 31: ...egoing warranty on services Products manufactured by a third party Third Party Product may constitute contain be contained in incorporated into attached to or packaged together with the goods Buyer ag...

Страница 32: ...within the user s knowledge and control it is essential the user evaluate the products to determine whether the product is fit for the particular purpose and suitable for the user s application All pr...

Отзывы: