29-31 Richland St. Kingsgrove. Sydney NSW 2208 Australia
Phone: 02 9554 9600 | Fax: 02 9554 9433
[email protected] | www.domuslighting.com
Installation Manual
Yellow/Green(Lamp Wire)
Blue(PIR Wire)
Black(PIR Wire)
Brown(PIR Wire)
Brown(Power Cable)
Yellow/Green(Power Cable)
Blue(Power Cable)
Blue(Lamp Wire)
Brown (Lamp Wire)
Wall Mounting Cover
Screws (M3--2pcs)
Screws (M3--2pcs)
Gasket
Rubber Stopper
Lamp Body
Plastic plugs
Power Cable
Cable Anchorage
Fixing Cover Screws(x2)
Terminal Block
Mounting Wall Screws (2pcs)
Installation
1.
Installation by a licensed electrician and according to IEC wiring Regulation.
2. Switch power off at the meter box and ensure that there is no power to the lamp.
3.
Unscrew the Fixing Cover Screws then remove the cover.
4.
Remove the Cable Anchorage and Terminal Block.
5. Use the plastic back box to mark the position of screw holes onto mounting surface. Drill the wall to
depth of about 4 cm and fit the wall plugs (supplied). Care should be taken to avoid drilling or screwing
into concealed electrical wiring.
6.
Connecting the Power Cable to the Terminal Block, ensure the cable must penetrate through
the Cable Gasket.
7.
Affix the back box to the mounting surface with Mounting Wall Screws (supplied).
8. Re-fit the Terminal Block and Cable Anchorage.
9.
Re-fit the cover.