10
EN
Operation
MasterFlush 7600 Series Toilet
q
w
e
10
Routing Hoses
q
Sanitation Hose
e
Hose Clamps
w
Floor Access Hole
5. Drill access holes for the hoses if necessary.
I
Plumbing can be routed either above- or below-
floor as required.
6. Route either a 1.5 in. (38 mm) ID flexible sanitation
hose or a 1.5 in. (38 mm) ID PVC or ABS pipe from
the waste tank to the check valve.
7. Connect the flexible sanitation hose directly to the
check valve with hose clamps.
8. Reconnect the water supply line and torque the
connection to 30–40 in. lb (3.4–4.5 N·m).
9. Connect the electrical power to the toilet according
to the wiring diagram. See “Specifications” on
page 5.
10. Fasten the toilet to the floor using a hex-head screw
on each side of the base.
11. Cover the fasteners with the plastic caps.
12. Turn on the electrical power to the toilet.
13. Turn on the water supply to the toilet.
14. Flush the toilet several times and check for leaks.
15. Attach the pump/base cover to the base using the
screws at the sides of the toilet base and using the
locking tabs at the sides and the back.
7 Operation
NOTICE:
Make sure guests understand the toilet
operation before use. Failure to follow these instructions
could cause clogs or damage to the toilet or the system.
This section describes how to operate the toilet and use
the different flush settings.
7 .1 Adding Water to the Bowl
Adding water to an empty bowl helps prevent holding
tank odors from entering the living space. Adding water
is recommended prior to flushing solids and toilet paper.
q
11
Adding Water to the Bowl
q
Add Water
1. To add water to the bowl, press the flush pedal
part-way down.
2. Release the pedal.
I
To avoid a possible overflow, the water flow will
stop automatically if the pedal is pressed too long.