Technical User Guide
DOl 10 kit for water temperature
3
2 Mounting guide
2.1 Recommended tools
Below follows a list of tools recommended for installation of the DOL 10 kit.
Item
Description
Tape measure
Cordless drill
Needle-nose pliers
Side cutter
2.2 Mounting
Must be mounted approx. 2/3 from the start of the middle water line.