15
Sidhil recommends that every six months the following maintenance procedures
should be carried out to help prolong the life of the plinth:
• Ensure that all fixings including nuts and bolts are tight and that none are missing
or incomplete.
• Check that all cabling is in good condition and that wear or abrasion has not
caused any excessive bending, kinking or damage.
• Check that the mains cable plug is not damaged. Should damage or deterioration
occur to the mains cable or plug, they must be replaced by authorised Doherty
service or repair personnel or approved service agents only.
WARNING!
Prior to any general maintenance always disconnect the plinth from the mains supply.
9. MAINTENANCE
Содержание PLE01
Страница 1: ...DOHERTY 2 3 Section Plinths User Instructions www sidhil com ...
Страница 2: ......
Страница 19: ...17 ...