CAUTION!
If the trailer weighs more than 1,000 lbs (453 kg)
loaded, it should have its own brakes and they
should be of adequate capacity. Failure to do this
could lead to accelerated brake lining wear, higher
brake pedal effort, and longer stopping distances.
Towing Requirements — Trailer Lights And Wiring
Whenever you pull a trailer, regardless of the trailer size,
stoplights and turn signals on the trailer are required for
motoring safety.
The Trailer Tow Package may include a four- and seven-
pin wiring harness. Use a factory approved trailer har-
ness and connector.
NOTE:
Do not cut or splice wiring into the vehicles
wiring harness.
The electrical connections are all complete to the vehicle
but you must mate the harness to a trailer connector.
Refer to the following illustrations.
514
STARTING AND OPERATING
Содержание Charger 2016
Страница 4: ......
Страница 7: ...1 INTRODUCTION 5...
Страница 10: ......
Страница 189: ...Distance Setting 4 Bars Longest Distance Setting 3 Bars Long 3 UNDERSTANDING THE FEATURES OF YOUR VEHICLE 187...
Страница 221: ...Single 1 2 Second Tone Solid Arc Slow Tone Solid Arc 3 UNDERSTANDING THE FEATURES OF YOUR VEHICLE 219...
Страница 258: ......
Страница 263: ...INSTRUMENT CLUSTER BASE Instrument Cluster For 3 6L and 5 7L 4 UNDERSTANDING YOUR INSTRUMENT PANEL 261...
Страница 266: ...INSTRUMENT CLUSTER PREMIUM Instrument Cluster For 6 4L 264 UNDERSTANDING YOUR INSTRUMENT PANEL...
Страница 388: ...Manual Control Setting Suggestions For Various Weather Conditions 386 UNDERSTANDING YOUR INSTRUMENT PANEL...
Страница 470: ...468 STARTING AND OPERATING...
Страница 520: ......
Страница 625: ...MAINTENANCE SCHEDULES CONTENTS MAINTENANCE SCHEDULE 624 Maintenance Chart 626 8...
Страница 632: ......
Страница 644: ......
Страница 645: ...INDEX 10...