01/22/2010
5. Remove the fasteners and sealer from around the patch panel. Cut away the sound
deadener pad to expose the transmission PTO access.
6. You are now able to install and assemble the PTO and pump through the opening.
Note: larger pumps must be inserted through the hole and moved toward the rear of
the opening before installing the PTO. The pump is then slid forward to connect to
the installed PTO.
7. To assemble, reverse the above procedure using RTV to reseal the PTO floor pan
patch panel.
2011 Chassis Cab PTO Operation & Installation Guide
IN
+
OUT
-
ALL
IN
+
OUT
-
ALL
Содержание 2011 RAM 3500
Страница 9: ...01 22 2010 2011 Chassis Cab PTO Operation Installation Guide IN OUT ALL IN OUT ALL ...
Страница 10: ...IN OUT ALL IN OUT ALL 01 22 2010 2011 Chassis Cab PTO Operation Installation Guide ...
Страница 11: ...01 22 2010 2011 Chassis Cab PTO Operation Installation Guide IN OUT ALL IN OUT ALL ...
Страница 12: ...01 22 2010 2011 Chassis Cab PTO Operation Installation Guide IN OUT ALL IN OUT ALL ...
Страница 13: ...01 22 2010 2011 Chassis Cab PTO Operation Installation Guide IN OUT ALL IN OUT ALL ...
Страница 14: ...IN OUT ALL IN OUT ALL ...