background image

5030- Flush Pop Up Outlet 
Installation Instructions

How to Install the Outlet

Step 1 -

 

 

Select a location for the pop-up outlet that 

meets the following requirements:

• 

The edge of the cut out should be at least 40mm 
from the nearest wall.

• 

A power outlet should be within 1.5 meters of the 
installation cut out for the power cord to reach.

• 

Benchtop thickness is between 10-45mm.

• 

Consult the following illustrations to ensure there is 
sufficient space underneath the benchtop.

Step 2 -

 

 

Cut a 

95mm hole in 
the surface of 
the benchtop to 
create the installation 
cut out.

of space needed 

under benchtop

benchtop 

thickness

Cut out size

326

mm

10-45

mm

QUAD

5030-1333

5030-1133

TRIO

5030-1330

5030-1130

DUO

5030-1300

QUAD

5030-1333
5030-1133

TRIO

5030-1330
5030-1130

• 

For indoor use only.

• 

Avoid liquid spills into the outlet.

• 

When using the wireless charger, do not place 

metal objects, magnets, magnetic stripe cards, etc. 

• 

Be sure to ground connection.

• 

Do not disassemble the unit.

• 

If the product has malfunctioned, electrical 

maintenance is required by a professional.

CAUTION – READ CAREFULLY

95

mm

Downloadable Resources

For additional planning resources, visit 

dockingdrawer.com/downloads

• Spec Books
• Tear Sheets

• Electrical Certifications
• Cut Out Templates

DUO

5030-1300

of space needed 

under benchtop

benchtop 

thickness

277

mm

10-45

mm

of space needed 

under benchtop

benchtop 

thickness

227

mm

10-45

mm

Outlet #1

Release 

Button

QI Wireless 
Charging Top

Tower

1 USB-C (PD) 
& 1 USB-A

Outlet #2

Outlet #3

Base

Ring

Adjustable
Ring

Отзывы: