TDR9000
™
Circuit Breaker Test System User’s Guide
72A-1898 Rev. A 11/01
1-21
Monday
, November 26, 2001 1:09 pm
Running the Continuity Test produces the Test Results window shown in
Figure 1.16.
Figure 1.16 Continuity Test Results
Step 3: Performing the Pretest Checklist
Use the checklist given in Table 4.8 on page 4-70 to ensure that the
system is safely configured for testing, then reapply DC power to the
circuit breaker Trip and Close circuits.
Step 4: Running the Test
Figure 1.17 shows the initial window for running a Trip (O) test.
Figure 1.17 Run Test
Содержание TDR9000
Страница 26: ...xxii 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 50: ...Step 5 Saving Test Results 1 24 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 98: ...3 28 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 200: ...Disconnecting After the Test 4 102 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 362: ...B 34 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 388: ...D 6 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 392: ...E 4 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 394: ...F 2 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 442: ...I 32 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 454: ...I 12 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...