8
•
The enclosure on the machine’s right rear side
houses the band drive motor control.
Electrical Enclosure Locations.
2.
The following are important disconnect
precautions:
Both disconnects must be on before the
machine will operate. Turning off
either
disconnect will shut down the machine.
Both enclosures must be closed and the
appropriate securing screws must be in place
before starting machine operation.
DO NOT connect power to the band drive motor
control enclosure.
3.
Turn the disconnect switch on the electrical cabinet
to "OFF". Then:
(a)
Loosen the screws at the right
door edge and open the door;
(b)
Familiarize yourself
with operation of the disconnect switch operating
handle, door interlock function, switch drive dog and
shaft/clamp operating positions.
4.
Punch a one (1) inch (25.4 mm) diameter or larger
hole in the side of the electrical cabinet. Then:
(a)
Bring power wiring (L1, L2, L3 and ground) through
the hole (the cable and connector are to be supplied
by the customer).
DO NOT bring the power cable
through any holes in the back wall. These are
for installation of future accessories.
FLOOR INSTALLATION (Continued....)
3.
Place the level front to back on the fixed vise rails
and adjust. Again, weight must bear evenly on all
foot pads.
4.
The following are important dimensions to be
obtained during leveling:
•
The roller and vise bed bearing surfaces are to be
co-planar within 0.030 inch (0.76 mm) T.I.R., or
0.0008-inch per inch (0.02 mm per mm) mearsured
from the plane of the saw band to the outboard
roller.
•
The tensioned saw band between the saw guides
is to be perpendicular to the fixed vise jaw faces
within 0.000 to 0.002 inch (0.000 to 0.050 mm) at
maximum saw guide arm spacing.
5.
After the machine has been leveled, install anchoring
screws through the base pad holes next to the
leveling screws.
6.
Remove the protective shipping bracket installed
to connect the saw head to the base frame during
shipping.
Keep this bracket in case the machine
needs to moved at a later time.
7.
Install roller stock conveyor(s) if supplied as
optional equipment.
These do not attach to the
machine and should be anchored to the floor
separately.
ELECTRICAL INSTALLATION
Electrical installation must be made by
authorized electrical maintenance personnel
only.
1.
Refer to the machine specifications plate on the saw
head frame to verify that the electrical supply circuit
will meet the voltage/phase/frequency/amperage
requirements listed. A basic data plate is reproduced
on this manual’s introductory page.
2.
The electrical supply to this machine must be a
dedicated circuit.
Electrical Enclosures
1.
It is important to note that there are
two
(2)
significant electrical enclosures on this machine.
Each enclosure has a through-the-door disconnect
switch.
•
The main enclosure is combined with the operator’s
control panel on the front of the machine. Power
is connected to this enclosure.
Содержание C-4100NC
Страница 1: ...C 4100NC Serial No 524 97116 to 524 11322 524 13338 to Band Sawing Machine Instruction Manual ...
Страница 5: ...1 MACHINE DIMENSIONS FOOT PAD LAYOUT ...
Страница 6: ...2 MACHINE DIMENSIONS Continued INCHES 03 MILLIMETERS 1 mm FLOOR PLAN 5 Foot Index Option ...
Страница 7: ...3 MACHINE DIMENSIONS Continued INCHES 03 MILLIMETERS 1 mm FRONT VIEW ...
Страница 9: ...5 MACHINE FEATURES TOP VIEW FRONT VIEW ...
Страница 35: ...31 LUBRICATION NEXT 2 PAGES ...
Страница 37: ...33 LUBRICATION DIAGRAM FRONT VIEW SIDE VIEW REAR VIEW LEFT SIDE ...