background image

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

5.  History Screen: Contains the runtime hour meter of the unit and the fault history table. 

•  The runtime hour meter indicates the actual on time of the UV system, to the closest 1/10 hour.

•  The fault history table will indicate the fault and the accompanying time stamp, which is relative to the runtime 

hour meter. 

•  Up to ten faults are listed with the most recent at the top of the table. 

•  The function buttons allow navigation through the fault history table screens. 

6.  Fault Counters Screen: Contains a list of possible faults for the system (model dependent) and how many faults have 

occurred. The fault count can be used during troubleshooting to identify common faults in the system. All fault counts 

can be reset through the function key. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      

 

 

 

 

Banner Message 

7.  Banner Message: Located on the top of all screens, this field will provide messages and alerts relative to the real-time 

operation of the unit.

3C.  System Shut-Down

Followed for servicing or storage.

1.  Shut off water flow to the unit and/or close isolation valves if available.

2.  Shut off power at the breaker.

3.  Open enclosure door to access internal components.

NOTE: 

Water pressure may still be present depending on system plumbing. Ensure water pressure is relieved prior to 

servicing any water plumbing components.

3D. Water Chemistry

The AOP Pro will provide the benefits of oxidation, UV germicidal disinfection treatment and advanced oxidation with 

minimal impact to other water chemistry parameters. However, chlorine or other sanitizer residual levels must be 

maintained as required to meet local codes. Regular residual testing must be performed as usual. 

Fault Counters Screen

History Screen

3. OPERATION

Содержание DEL AOP PRO 100

Страница 1: ...4 2654 01 Rev A CMPCOMMERCIAL COM DEL AOP PRO 50 100 INSTALLATION INSTRUCTIONS PRODUCT MANUAL...

Страница 2: ...high concentrations of ozone and long term inhalation of low concentrations of ozone can cause serious harmful physiological effects DO NOT inhale ozone gas produced by this device For your safety do...

Страница 3: ...Shut Down 7 3D Water Chemistry 7 4 Maintenance Service 4A System Electromechanical Overview 9 4B Ozone System Maintenance 9 4C UV Reactor Service and Maintenance 10 4D PLC Memory Battery Backup Replac...

Страница 4: ...re cost effective to operate and maintain AOP Pro products are NSF certified for supplemental disinfection of pools and spas AOP PRO 50 AOP PRO 50D AOP PRO 100 AOP PRO 100D FLOW 25 50 GPM 30 100 GPM I...

Страница 5: ...r has a sustained 1 3 ppm free chlorine level 3 Test pool chemistry and adjust pH between 7 4 and 7 6 Adjust total alkalinity between 80 and 120 ppm 4 Run pool filtration continuously for 24 hours pri...

Страница 6: ...mportant wiring information 2D 1 Main Power Connect the AOP Pro so that it operates simultaneously with the pool pump An electrical junction box and wires are provided on the left wall of the enclosur...

Страница 7: ...return of the pool Use the fittings provided in the parts kit to connect the AOP Pro inlet and outlet to the plumbing The included injector and degas management system components should be installed i...

Страница 8: ...upplied and the remote start contacts are closed 2 FLOW This indicator will illuminate when the water flow has been established 3 UV C This indicator will illuminate when the UV system is active 4 OZO...

Страница 9: ...rs remaining on the countdown timers are used to determine service messaging and alert reminders More than 10 remaining no banner message 10 remaining SERVICE SOON banner message 5 remaining SERVICE R...

Страница 10: ...on key Banner Message 7 Banner Message Located on the top of all screens this field will provide messages and alerts relative to the real time operation of the unit 3C System Shut Down Followed for se...

Страница 11: ...ter Degas Valve Water Out Mixing Degas Vessel MDV UV Reactor Air Check Valve Flow Switch Air Filter Outlet Union Thermal Protection Location Not Shown Inlet Union Ballast Ozone Power Supply Ozone Cell...

Страница 12: ...destruct Ozone enriched water then exits the mixing degas vessel MDV and enters the input of the AOP Pro 4A 5 UV Reactor There are two lamps in each UV reactor of the AOP Pro powered by an energy effi...

Страница 13: ...decreased based on the condition of the quartz tubes or observed water conditions 4C 1 UV Lamp Removal 1 Remove the UV service access panel from the top of the enclosure NOTE The AOP Pro will not ope...

Страница 14: ...the sealing O ring from the quartz tube and set aside 8 Wipe all residue from the quartz tube If calcium deposits are encountered use a mild solution 4 1 of water and muriatic acid available at pool s...

Страница 15: ...main inlet and outlet fittings on the AOP Pro 4 Turn the circulation pump ON and check the quartz tube seals for leaks 5 Turn the circulation pump OFF once you have confirmed that the quartz tubes ar...

Страница 16: ...performed annually 4E Winterizing If the pool will be shutting down for the winter months and the AOP Pro will remain exposed to freezing temperatures the unit must be drained to prevent freeze damag...

Страница 17: ...wired and operating properly Symptom WAITING ON SYSTEM FLOW message on HMI screen or FLOW indicator not lit 1 Insufficient flow through AOP Pro a Verify that the main system pump is running properly...

Страница 18: ...CEMENT INTERVAL PLC MEMORY BACKUP BATTERY included with PLC option only 5 1402 Annually AIR FILTER ELEMENT 7 1120 2250 Hours AIR CHECK VALVE 7 1140 01 8750 Hours OZONE CHECK VALVE 8 0330 8750 Hours OZ...

Страница 19: ...ro Pressure Drop Characterization NOTE Tested on simulated recirculation system using a variable speed pump No back pressure added Actual results will vary depending on pump and plumbing variables APP...

Страница 20: ...the inlet outlet unions b Flow the cleaning solution from bottom to top 2 When cleaning is complete drain the AOP Pro completely from the inlet union and run the pool system immediately for an extend...

Страница 21: ...Below Keep for Your Records Installer _______________________________________________________________ System Purchased From ______________________________________________ Installation Date __________...

Страница 22: ...19 NOTES...

Страница 23: ...20 NOTES...

Страница 24: ...CMP LLC 36 HERRING ROAD NEWNAN GA 30265 WWW CMPCOMMERCIAL COM 1021ab...

Отзывы: