LIFT TWO ADJACENT CORNERS
SIMULTANEOUSLY TO MINIMIZE
STRESS ON FRAME JOINTS
2 PERSON MIN. 3 PERSON OPTIMUM
BEGIN AT PEAK
DRAIN INSTALLATION
DRAIN PUMP INSTALLATION
ROOF INSTALLATION
SPRAYER ADJUSTMENT
ENDWALL ATTACHMENT
LEG ATTACHMENT
9
10
Attach endwalls. Begin attachment at peak of shelter and work
outward from center connecting hook and loop strips.
NOTE: Endwalls can be attached once shelter is fully erected.
Lift shelter one half first. Using four (4) personnel, lift at two corners
and attach two (2) legs per corner. Once first half is erected, repeat
step on opposite half.