/ /
//////
DEPLOYEDLOGIX.COM // @DEPLOYEDLOGIX // EMAIL: [email protected] // P: 541.357.5978
©️ 2021 DLX ENTERPRISES LLC. // VERSION 1.02
12
DRAIN INSTALLATION
DRAIN PUMP INSTALLATION
FOLD ROOF COVER
INSULATION REMOVAL
6
7
Remove each pin, and slide grommet off frame posts. Starting at one
side, fold roof over itself in 18 - 24” folds. Remove from frame and
fold to fit case or bag. Folding instructions are provided at Step 12.
Disconnect insulation straps from corner joints (BLACK ARROWS).
Disconnect insulation straps from arch sections (WHITE ARROWS).
DO NOT DISCONNECT STRAPS AT PEAK OR INTERIOR RIDGE-
LINES.
Содержание ASAP-HUB
Страница 19: ...18 ...