DLG E-BOX-48100R LFP Battery User Manual
9
Always observe local safety regulations and the safety requirements
listed below during installation process.
Before installing or removing the device, make sure that the power
system is not powered and that the battery device is turned off.
Distribution cabling should be reasonable and with protective measures
to avoid being touched during operation.
6.1.2 Checking the operating environment
The operating environment should meet the requirements
described in Chapter 4, “Operating Environment”. Otherwise, it needs to
be adjusted and re-examined.
6.1.3 Tools
The tools that may be used are shown in Table 6-1.
Table 6-1 Tools
Tools
Screwdriver (Slotted, Phillips)
Multimeter
Wrench
clip-on ammeter
Diagonal pliers
Insulating tape
Thermometer
Pliers
Anti-static wrist ring
Clip Pliers