38
According to the price of electricity in different time periods, users can set the
corresponding time to charge and discharge from the grid.
Grid Setup:
Output power percentage---The discharge current of the battery can be changed
here.
PV Connect mode:
Independent------PV connection single channel selects this mode.
Load power priority:
If the battery is selected, the load will use the battery power first.
If the power grid is selected, the load will give priority to the power grid.
Battery grid priority:
If PV is selected, only PV power is used to charge the battery.
If PV+Grid is selected, PV power will be given priority to charge the battery, but not
enough will be supplied by the Grid.
Battery grid switch:
Select enable, the battery can discharge to the grid.
Содержание SOLUNA S12 EU
Страница 1: ...1 User Manual SOLUNA Home Storage System S12 EU DLG Energy Shanghai Co Ltd July 2019 Revision A 0 ...
Страница 15: ...15 2 6 Appearance Figure 2 3 Appearance Number Name Remark Soluna bread LCD panel ...
Страница 16: ...16 Figure 2 4 Appearance Number Name Remark System outlet System outlet Emergency Stop System inlet Label ...
Страница 17: ...17 Figure 2 5 Appearance Number Name Remark Door lock of system Key ...
Страница 18: ...18 3 Installation 3 1 Installation tools ...