Section
4
Assembling Your Stockade Log System
4.1
Install Base Course to Foundation (Details L-1-RR & RF) ..... 4-4
Base Course to Subfloor .................................................... 4-4
4.2
Window & Door Bucks (Details L-40 & L-41) ....................... 4-7
Installing Door Bucks ........................................................ 4-8
4.3
Install Wall Courses ................................................................. 4-9
Keep Walls and Corners Plumb ......................................... 4-9
Installing Window Bucks ................................................ 4-10
Stacking Identical Logs ................................................... 4-10
4.4
Second Floor Girder Installation ............................................ 4-11
4.5
Second Floor Beams .............................................................. 4-12
4.6
Temporary Second Floor Decking ......................................... 4-12
4.7
Log Gable Ends ...................................................................... 4-13
How to Install Log Gable Ends ....................................... 4-13
Cutting Log Gable Ends (Detail L-30) ............................ 4-13
Installing Log Siding over Non-Heated Areas
4.8
Installing Doors and Windows (Details L-40; L-41) ............. 4-14
Preparations ..................................................................... 4-14
Installing the Window or Door ........................................ 4-14
Exterior Doors ................................................................. 4-16
4.9
Electrical Considerations ....................................................... 4-17
4.10
Log Caulking (Interior & Exterior) ........................................ 4-18
Applying Caulk ................................................................ 4-18
4.11
Exterior & Interior Wood Preservative .................................. 4-21
Exterior Wood Preservative Application ......................... 4-21
Interior Wood Preservative Application .......................... 4-22
Additional Suggestions .................................................... 4-22
Содержание DIY-4
Страница 2: ...4 Stockade Assembly 2019 DIY Log Cabins LLC 4 2 Last Revised 08 19 19...
Страница 23: ...DIY Log Cabins Construction Manual 2019 DIY Log Cabins LLC 4 23 Detail L 1 RR Base Course to Subfloor...
Страница 24: ...4 Stockade Assembly 2019 DIY Log Cabins LLC 4 24 Detail L 1 RF Base Course to Subfloor...
Страница 25: ...DIY Log Cabins Construction Manual 2019 DIY Log Cabins LLC 4 25 Detail L 30 TYP Log Gable End Cut at Roofline...
Страница 26: ...4 Stockade Assembly 2019 DIY Log Cabins LLC 4 26 Detail L 40 RR Typical Window Opening in Log Wall...
Страница 27: ...DIY Log Cabins Construction Manual 2019 DIY Log Cabins LLC 4 27 Detail L 41 RR Typical Door Opening in Log Wall...
Страница 28: ...4 Stockade Assembly 2019 DIY Log Cabins LLC 4 28 Detail L 51 RR Second Floor Beam System at Gable End Wall...
Страница 29: ...DIY Log Cabins Construction Manual 2019 DIY Log Cabins LLC 4 29 Detail L 52 RR Beams Meeting Over Girder...
Страница 30: ...4 Stockade Assembly 2019 DIY Log Cabins LLC 4 30 Detail L 54 RR Beams Cantilevered Over Girder...
Страница 33: ...DIY Log Cabins Construction Manual 2019 DIY Log Cabins LLC 4 33 Detail L 5 RR Typical Horizontal Joint...
Страница 34: ...4 Stockade Assembly 2019 DIY Log Cabins LLC 4 34 Detail L 6 RR Typical Butt Joint...
Страница 35: ...DIY Log Cabins Construction Manual 2019 DIY Log Cabins LLC 4 35 Detail L 7 RR Typical Stockade Corner...