22
750 Tracker - OPERATION
BEACON TRACKING MODES
22
750 Tracker - OPERATION
BEACON TRACKING MODES
Calibration Procedure
1.
Install beacon into
toolhead and place on
ground exactly 10 ft (3 m)
away from tracker. Make
sure no metal objects
including drilling unit and
drill pipe are within 20 ft
(6 m) of tracker and
toolhead.
2.
Position tracker parallel to
center of toolhead.
3.
Turn tracker on and press
and hold depth and up
arrow keys until calibration mode is entered. Release keys.
4.
Verify calibration by moving tracker 15 ft (4.5 m) away from
toolhead. Check depth. If reading is not 15 ft (4.5 m),
recalibrate tracker.
Содержание Subsite 750
Страница 6: ...6 750 Tracker CONTENTS SERVICE PROCEDURE 6 750 Tracker CONTENTS SERVICE PROCEDURE...
Страница 20: ...20 750 Tracker SAFETY ALERTS 20 750 Tracker SAFETY ALERTS...
Страница 34: ...34 750 Tracker OPERATION 34 750 Tracker OPERATION...
Страница 36: ...36 750 Tracker MAINTENANCE 36 750 Tracker MAINTENANCE...