2
Install the first pipe (EE) onto base floor (CC)
1
Install the rubber pad onto base floor (CC)
CC
EE
4mm
H (X2)
3 of 8
Rubber Pad
(x4)
Rubber Pad
(x4)
CC
CC
(Second Pipe)
DD
(First Pipe)
EE
(AV Tray)
BB
(Base Floor)
CC
B . Component checklist
AA
(Head Assembly)