background image

   attempting to begin your installation.

who has a basic knowledge of bui di

l ng construction,installations and fully

     understands these instructions.

    

omeone assist you to lift and position your equipment.

bolts firmly, but do not over tighten. Over tightening can damage the items and greatly reduce 

   their ability to hold. Please refer to suggested torque values where applicable in these instructions.

2

5

Mount the head assembly (AA) onto second pipe

 

3

7

M

 Install the first pipe (GG) onto base floor (DD)

1

 

 Install the Rubber pad onto base floor (DD)

ount the AV tray (CC) onto the first pipe (GG) 

 

 

 

 

4

8

e

l

g

n

a

 t

s

u

j

d

A

9

 

 

 

Mount the second pipe (EE)

Mount display

 

(FF)

6

 

 

Mount 

adapter plate (FF) to screen

A

    .  Installation hardware kits

Using cable management

 

10

 

Fix the stand to the floor (optional)

2 of 8

Metal washer

diam

Rubber Pad(x4)

eter 6 (x4)

Metal washer

Open wrench (x1)   

diameter 6 (x4)

4mm Allen Key (x1)

3mm Allen Key (x1)

5mm Allen Key (x1)

2.  For installing the stand cart

1. For TV’s

    

M6x25mm (x4 )

M5x25mm (x4 )

A

B

C

D

E

F

G

H

Socket pan head screw

M6*12mm (x6)

M8x25mm (x4 )

Spacer

13

x13x

8.2(

x4)

Spacer

13

x5x

8.2(

x4)

3.  For installing the stand cart

Anchor

(x4)

Lag Bolt

8X70mm(x4)

Содержание TVSDP2642B

Страница 1: ...INSTALLATION GUIDE TV Stand Mount TVSDP2642B Support 26 to 42 Screens Max Load Capacity 100 lbs 45 kg VESA 100x100 200x100 200x200 compatible ...

Страница 2: ...G onto base floor DD 1 Install the Rubber pad onto base floor DD ount the AV tray CC onto the first pipe GG 4 8 e l g n a t s u j d A 9 Mount the second pipe EE Mount display FF 6 Mount adapter plate FF to screen A Installation hardware kits Using cable management 10 Fix the stand to the floor optional 2 of 8 Metal washer diam Rubber Pad x4 eter 6 x4 Metal washer Open wrench x1 diameter 6 x4 4mm A...

Страница 3: ... pipe EE onto base floor CC 1 Install the rubber pad onto base floor CC CC EE 4mm H X2 3 of 8 Rubber Pad x4 Rubber Pad x4 CC CC Second Pipe DD First Pipe EE AV Tray BB Base Floor CC B Component checklist AA Head Assembly ...

Страница 4: ...EE 4 Mount the Second Pipe DD Mount the second pipe DD onto the first pipe EE BB EE EE DD 3mm Allen key 3mm Allen key 4mm Allen key G H x4 x4 4 of 8 5 Mou onto second pipe DD nt the Head Assembly AA AA 1 2 DD 5mm Allen key Screw off the nut first ...

Страница 5: ...te D E Recessed Mounting Holes If the mounting holes are recessed into the back of the display use the supplied spacer to pack the recessed hole Ensure that the brackets are securely fixed to the display 7 Open wrench Mount display Mount the universal adapter kit onto display Nut M6 X2 ...

Страница 6: ...8 Adjust angle 0 12 Height adjustable Height adjustable Second person will be required to assist 6 of 8 ...

Страница 7: ...9 Using cable management wire cable wire cable 7 of 8 ...

Страница 8: ...10 Fix the stand to the floor Optional Lag Bolt 8X70mm Anchor 8 of 8 ...

Отзывы: