9
Issue 01 - 05 2003
3
Setting for
concreting
AXIS
®
Design or AXOR
®
posts
in the ground or on a low wall
5
Check
the alignment
of the post (
Ref. 2
).
alignment with
a plumbline
2
6
If a kick board is to
be set:
Fix
the kick board
(
Ref. 3
) in the groo-
ve in the post (over-
hang on the external
side).
3
Overhang
7
Attach
the first panel
(
Ref. 4
) (spikes
upwards or down-
wards, crimps on the
side facing the outsi-
de of the site) in the
lugs of the post and
pull to the bottom of
the groove.
Keep
the panel ali-
gned throughout the
whole operation.
4
crimps
Spikes
8
Set 2 tensioning
tools in position
(
Ref. 5
).
5
4
Ram it down.
9
Pour
10 cm of conc-
rete into the bottom
of the second hole.
10 cm
10
Set
the second post
(
Ref. 6
).
X =
Sealing length
(
see page 20
).
X
+0.00
-
6
3
Set
the first post
(
Ref. 2
).
Pour
the concrete to
fill the hole.
X =
Sealing length
(
see page 20
).
X
+0.00
-
2
5m