Issue 01 - 05 2003
10
3
Setting for
concreting
AXIS
®
Design or AXOR
®
posts
in the ground or on a low wall
11
If a kick board is to
be set:
Fix
the kick board
(
Ref. 3
) in the groo-
ve of the second
post.
3
12
Attach
the second
post (
Ref. 6
) onto the
panel (
Ref. 4
).
4
6
13
Set
2 tensioning
tools in position
(
Ref. 5
).
5
14
Pour
the concrete
and
ram it down.
15
Check
the alignment
of the post (
Ref. 6
).
alignment with
a plumbline
6
16
Check
the panel is
level (
Ref. 4
).
4
17
Set
stays* in position
(
Ref. 7
) on either
side of the panel in
place.
Respect
the setting
time: 3 hrs minimum.
*stay: wooden strut
or prop.
7
18
Attach
the second
panel (
Ref. 8
) (spi-
kes upwards or
downwards, crimps
on the side facing the
outside of the site) in
the lugs of the post
and pull to the bot-
tom of the groove.
Keep
the panel ali-
gned throughout the
whole operation.
8
Crimps
Spikes