Page 53
AIM 2 Operation Manual
Task A. Installation Setup
1.
Set up the job for the installation. See the
Starting a Job
section in
Chapter 5
.
2. From the
HOME
screen, press
INSTALL
.
The
PRE-CONFIGURE ODU
screen appears
showing the default azimuth and elevation
coordinates for the job. If appropriate, the
default tilt coordinate also appears.
3. Perform the ODU site survey. Using the AIM
azimuth and elevation coordinates, confirm that
the selected location has a clear line-of-sight
to the supported orbital slots (see the ODU
Installation Tasks table on the previous page).
4.
Install the ODU according to the DIRECTV
procedure.
5.
Connect the AIM’s ODU F Connector to the
ODU’s LNB output.
6. Press
NEXT
on the
PRE CONFIGURE ODU
screen.
• If the installation includes two ODUs, the
SELECT ODU
screen appears. Highlight
the ODU to align and press
SELECT
to
continue.
The default coordinates for the job are based on the ODU type
and zip code selected for the job.
Содержание Advanced Installation Meter 2
Страница 6: ...Page 6 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 12: ...Page 12 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 14: ...Page 14 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 44: ...Page 44 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 50: ...Page 50 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 60: ...Page 60 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 66: ...Page 66 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 92: ...Page 92 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 104: ...Page 104 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 108: ...Made in U S A ...