Next is the T-Match assembly. Once again, refer to figure 4 and 5. Starting with the left
T-arm, viewed from the rear, pass a 6-32 X ½
” screw through a #6 internal tooth lock washer
and through a lug on the center conductor of the balun through a second # 6 internal tooth
lock washer, through the T-arm and into the insulator. Do not over-tighten the screw as the
threads of the insulator can be easily damaged. The right side is next. Pass a 6-
32 X ½” screw
through a #6 internal tooth lock washer, then the center conductor of the balun, another #6
internal tooth lock washer, the lug from the N connector, another #6 internal tooth lock washer,
the T-arm and screw into the insulator.
8)
Place a #8 internal tooth lock washer on the screw securing the driven element and the
T-arm support bracket, then the two ground lugs from the balun, then another #8 internal tooth
lock washer and nut. Tighten securely.
9)
Last, pass 8-
32 X 1 ¼” screws through the holes in the shorting bars and place a split
lock washer and nut on the other end. Slide the shorting bars over the ends of the driven
elements and over the T arms and measure from the boom to the inside edge of the shorting
bars and set the length. The following shows various shorting bar settings and the resultant
SWR plots:
160mm
Содержание DSEFO146-12
Страница 5: ...P a g e 5 DSEFO146 12 Rev 10 20 FIGURE 4 ...
Страница 6: ...P a g e 6 DSEFO146 12 Rev 10 20 ...
Страница 9: ...P a g e 9 DSEFO146 12 Rev 10 20 170mm ...
Страница 10: ...P a g e 10 DSEFO146 12 Rev 10 20 180mm ...