• Make sure that mounting screws are anchored into the center of the studs. Use of a stud finder
is highly recommended.
• Installers are responsible to provide hardware for other types of mounting situations.
• Installer must verify that the supporting surface will safely support the combined load of the
equipment and all attached hardware and components.
4
3
1a. Wood Ceiling Mounting:
50mm/2"
ø 4.5
m
m
ø 3/16"
2
1
Drill three
pilot holes
3
Screw the
ceiling plate
onto the ceiling
• When installing ceiling mounts on cinder block, verify the actual concrete thickness is at
least 1-3/8" (35mm) for using the concrete anchors. Do not drill into mortar joints! Be sure
to mount in a
solid part of the block, generally 1" (25mm) minimum from the side of the block.
It is suggested electric drill on slow setting is used to drill the hole instead of a hammer drill
to avoid breaking out the back of the hole when entering a void or cavity.
• Installer must verify that the supporting surface will safely support the combined load of the
equipment and all attached hardware and components.
WARNING
1b. Solid Brick and Concrete Block Mounting:
50mm/2"
ø 10
m
m
ø 3/8"
1
2
W-A
Drill three
pilot holes
Screw the
ceiling plate
onto the ceiling
W-A