5 • Service
Doc. 031644-02 9/03
5-7
12. When the lamp is fully seated, tighten the screws in the flange with a
screwdriver.
13. Squeeze the clip on the UV lamp connector and insert it into the 6-pin
bulkhead connector on the side wall. Route the wires through the wire guide
in the optical bench (see Figure 5-3).
14. Replace the lamp cover.
15. Thread the flow cell inlet tubing through the tubing guide on the lamp cover
and reinstall the tubing bracket.
16. Replace the flow cell cover and reconnect the inlet and outlet tubing.
17. Replace the detector front panel.
18. Turn on the detector power.
19. Start the PeakNet 6 or Chromeleon server.
To ensure proper performance, the lamp must be fully seated.
Do not pinch the UV lamp connector wires under the lamp cover.
Figure 5-3. Lamp Connections
Do not pinch the tubing under the flow cell cover.
Содержание PDA-100
Страница 33: ...3 Operation and Maintenance Doc 031644 02 9 03 3 7 Figure 3 2 PDA 100 3D Control Panel Example ...
Страница 72: ...PDA 100 Photodiode Array Detector 4 16 Doc 031644 02 9 03 ...
Страница 88: ...PDA 100 Photodiode Array Detector A 4 Doc 031644 02 9 03 ...
Страница 98: ...PDA 100 Photodiode Array Detector C 2 Doc 031644 02 9 03 ...