OPERATOR’S MANUAL
with Maintenance Information
Maintenance
51
Checklist C Procedures
C-1
Test the Platform Overload System (if
equipped)
DINGLI require that this procedure be
performed every 500 hours or six months,
whichever comes first OR when the machine
fails to lift the maximum rated load.
Testing the platform overload system regularly
is essential to safe machine operation.
Continued use of an improperly operating
platform overload system could result in the
system not sensing an overloaded platform
condition. Machine stability could be
compromised resulting in the machine tipping
over.
1 Turn the main power switch to “on”
position. Turn the key switch to ground
control and pull out the red Emergency
Stop button to the on position at both the
ground and platform controls.
2 Press the menu button at the lower right of
the page, The display content is as follows:
3 Press the password button at the top right
of the page The display content is as
follows:
4 Enter the password. Press the [ESC]
button and return to the display content of
step 2.
5 Press the [123] button, the display content
is as follows:
6 Press the [ECU] button, the display
content is as follows:
7 Press the [limit parameter] button, press
the left or right button to choose [height
Max Position] and set the page, press[+]
button to set the parameter to 120.Press
the enter button, The display content is as
follows:
Содержание JCPT0607DCS
Страница 3: ......
Страница 5: ......
Страница 15: ...OPERATOR S MANUAL with Maintenance Information Decals 10 ...