SIH 9TE - SIH 11TE
5 Transport
A lift truck is suited for transporting the unit on a level surface.
Carrying straps may be used if the heat pump needs to be trans-
ported on an uneven surface or carried up or down stairs. These
straps can be passed directly underneath the pallet.
ATTENTION!
The heat pump is not secured to the pallet.
ATTENTION!
The heat pump must not be tilted more than 45° (in any direction).
Use the holes provided in the sides of the frame to lift the unit
without the pallet. The side panel assemblies must be removed
for this purpose. Any commercially available length of pipe can
be used as a carrying aid.
ATTENTION!
Do not use the holes in the panel assemblies for lifting the device!
6 Set-up
6.1 General Information
The brine-to-water heat pump must be installed in a frost-free,
dry room on an even, smooth and horizontal surface. The entire
frame should lie directly on the floor to ensure an adequate
soundproof sea. If this is not the case, additional sound insulation
measures may be necessary.
The heat pump must be installed so that maintenance work can
be carried out without hindrance. This can be ensured by main-
taining a clearance of approx. 1 m in front of and on each side of
the heat pump.
Neither frost nor temperatures higher than 35° C must occur in
the installation location at any time of the year.
6.2 Acoustic Emissions
The heat pump operates silently due to efficient sound insulation.
To prevent noise transmission to the foundation, a suitable,
sound dampening rubber mat should be placed underneath the
base frame of the heat pump.
To prevent any sound from being transmitted to the heating sys-
tem, we recommend connecting the heat pump to the heating
system by means of hose sections.
7 Installation
7.1 General Information
The following connections need to be established on the heat
pump:
Flow and return of the brine (heat source system)
Flow and return flow of the heating system
Voltage supply
Temperature sensor
7.2 Heating System Connection
ATTENTION!
Flush the heating system prior to connecting the heat pump.
Before connecting the heating water system to the heat pump,
the heating system must be flushed to remove any impurities,
residue from sealants, etc. Any accumulation of deposits in the
liquifier could cause the heat pump to completely break down.
Once the heating system has been installed, it must be filled, de-
aerated and pressure-tested.
Consideration must be given to the following when filling the sys-
tem:
Untreated filling water and make-up water must be of drink-
ing water quality (colourless, clear, free from sediments)
Filling water and make-up water must be pre-filtered (pore
size max. 5 µm).
Scale formation in hot water heating systems cannot be com-
pletely avoided, but in systems with flow temperatures below
60 °C the problem can be disregarded.
With medium and high-temperature heating systems, tempera-
tures above 60 °C can be reached.
The following standard values should therefore be adhered to
concerning the filling water and make-up water (according to VDI
2035 Sheet 1):
The sensors which are delivered already connected and loosely
placed in the switch box must be mounted and insulated accord-
ing to the integration diagram.
Total heat
output in [kW]
Total alkaline earths
in mol/m³ and/or
mmol/l
Total
hardness in °dH
up to 200
2.0
11.2
200 to 600
1.5
8.4
> 600
< 0.02
< 0.11
Содержание SIH 11TE
Страница 2: ......
Страница 36: ...FR 12 452232 66 22 FD 9511 www dimplex de Français SIH 9TE SIH 11TE ...
Страница 43: ...www dimplex de 452232 66 22 FD 9511 A VII Anhang Appendix Annexes SIH 9TE SIH 11TE 3 2 Last Load Charge ...
Страница 50: ...A XIV 452232 66 22 FD 9511 www dimplex de Anhang Appendix Annexes SIH 9TE SIH 11TE ...
Страница 51: ...www dimplex de 452232 66 22 FD 9511 A XV Anhang Appendix Annexes SIH 9TE SIH 11TE ...