EN-6 452163.66.09 · FD 9312
www.dimplex.de
English
LA 9TU - LA 12TU
6.2 Connection on the heating side
The heating system connections on the heat pump are to be
made inside the device. Refer to the device information for the
connection sizes. Route the connection hoses out of the device
in a downwards direction. An optional pipe kit is available as an
accessory, which can be used to lead the connections out to the
side. Use a spanner to firmly grip the transitions when connecting
the heat pump.
Before connecting the heating water system to the heat pump,
the heating system must be flushed to remove any impurities,
residue from sealants, etc. Any accumulation of deposits in the
liquefier could cause the heat pump to completely break down.
Only applies to the LA 9TU:
ATTENTION!
The dirt trap included in the scope of supply is to be installed in the heat
return before the heat pump.
Cleaning and maintenance instructions can be found in the dirt
trap's installation and operating instructions.
Once the heat pump has been connected to the heating system,
it must be filled, de-aerated and pressure-tested.
Consideration must be given to the following when filling the sys-
tem:
Untreated filling water and make-up water must be of drink-
ing water quality
(colourless, clear, free from sediments)
Filling water and make-up water must be pre-filtered (pore
size max. 5µm).
Scale formation in hot water heating systems cannot be com-
pletely avoided, but in systems with flow temperatures below
60°C the problem can be disregarded.
With medium and high-temperature heat pumps, temperatures
above 60°C can be reached.
The following standard values should therefore be adhered to
concerning the filling water and make-up water (according to VDI
2035 Sheet 1):
Minimum heating water flow
The minimum heating water flow rate through the heat pump
must be assured in all operating states of the heating sys-
tem. This can be accomplished, for example, by installing either
a dual differential pressureless manifold or an overflow valve.
The procedure for adjusting an overflow valve is described in the
Chapter Start-Up. When the minimum flow rate is undershot, the
plate steel exchanger in the refrigerating cycle can freeze, which
can lead to total loss of the heat pump.
NOTE
The use of an overflow valve is only recommended for panel heating and
a max. heating water flow of 1.3 m³/h. System faults may result if this is
not observed.
Antifreeze
Heat pump systems, which cannot be guaranteed to be
frostfree, should be equipped with a drainage option (see Fig.).
The antifreeze function of the heat pump manager is active
whenever the heat pump manager and the heat circulating pump
are ready for operation. If the heat pump is taken out of service
or in the event of a power failure, the system has to be drained.
The heating circuit should be operated with a suitable antifreeze
if heat pump systems are implemented in buildings where a
power failure cannot be detected (holiday home).
Opening the upper cover panels
Closing the upper cover panels
Total heat
output in [kW]
Total alkaline earths
in mol/m³ and/or
mmol/l
Total
hardness in °dH
up to 200
2.0
11.2
200 to 600
1.5
8.4
> 600
< 0.02
< 0.11
1.
2.
3.
2.
1.
1.
2.
2.
3.
3.
Содержание LA 12TU
Страница 2: ......
Страница 14: ...DE 12 452163 66 09 FD 9312 www dimplex de Deutsch LA 9TU LA 12TU...
Страница 24: ...EN 10 452163 66 09 FD 9312 www dimplex de English LA 9TU LA 12TU...
Страница 43: ...www dimplex de 452163 66 09 FD 9312 A IX Anhang Appendix Annexes LA 9TU LA 12TU 3 2 Last Load Charge LA 9TU...
Страница 47: ...www dimplex de 452163 66 09 FD 9312 A XIII Anhang Appendix Annexes LA 9TU LA 12TU 3 6 Last Load Charge LA 12TU...
Страница 54: ...A XX 452163 66 09 FD 9312 www dimplex de Anhang Appendix Annexes LA 9TU LA 12TU...
Страница 55: ...www dimplex de 452163 66 09 FD 9312 A XXI Anhang Appendix Annexes LA 9TU LA 12TU...