Ascari - 12kW -
page 17 -
3.5 - Control accessories wiring
1 - 2
:
External command relay contact
3 - 4
:
Outside temperature sensor
10 - 11:
Total cut-out DT (remove the bridge) and / or 65°C heating
floor safety limitator (mandatory) with manual reset.
See § 1.3.1.
12 - 13:
Partial cut-out DP1 (remove the bridge)
14 - 15:
Partial cut-out DP2 (remove the bridge)
25
:
External command (use phase 230V common to the
boiler on pin L1)
• To avoid electro-magnetic interferences, power connection and sensors connections will be
isolated. Also avoid using diversion box.
• Connectors will be of electrolitic quality brass (no corrosion of denuded ends at connection
points).
• Never use telephone wire (cross-section of sub-connectors too thin and easy breakable at
connections points).
• Cross-section of connectors must be between 0,5 and 1mm².
CC
2
R
15
14
13
12
11
10
9
8
7
6
5
1
14
11
External
command
4
3
25
S.Ext