![Digital Loggers Web Power Switch III Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/digital-loggers/web-power-switch-iii/web-power-switch-iii_user-manual_2499170007.webp)
WEB POWER SWITCH III
Setup Page
The settings page allows the administrator to configure the power switch. These settings are supported:
Switch and Outlet Names
Use the switch name fields to assign a Switch Name to the power switch itself. Examples are “Server Rack Power Strip”. The
Switch Name field appears on the top of the home page. Assign a separate name to each outlet, such as “Linksys Router” or
“Email Server” to make identification of each circuit simple.
Power-On Sequence Delay
When a time value is entered in the “All ON sequence delay” field, the power switch will pause for a period of time before
switching each outlet on in sequence. This delay helps prevent the power surges and blown circuit breakers which can occur
when multiple devices are switched on simultaneously. A delay of 60 seconds is suggested for server applications.
You may also enter a screen refresh delay. If “Enable screen refresh” is checked, and a delay value is entered, your browser
should periodically update the status screen.
Power Loss Recovery Modes –
IMPORTANT SAFETY SETTINGS
The power loss recovery mode setting has three settings which take effect after a power failure:
1. You can turn all outlets off (all systems will be switched off until manually turned on later) by checking the first box.
2. You can automatically turn all outlets on using the “All ON sequence delay” described above. Check the second option
to do this.
3. You can return to the same outlet settings that were used prior to the power loss. The “All ON sequence delay” will also
be used in this instance.
User Defined Web Links