background image

 

             

iv

Figures

Figure 1  Main Logic Board Jumper Locations ................................................. 4
Figure 2  Removing the CPU Module ............................................................... 7
Figure 3  Installing a Second CPU Chip ........................................................... 8
Figure 4  Installing the Secondary Cache.......................................................... 9
Figure 5  CPU Module Jumper and Socket Locations......................................  10
Figure 6  Installing the CPU Module  .............................................................  11

Tables

Table 1  Kit Contents  .....................................................................................  2
Table 2  CPU Module Jumper Settings  ..........................................................  10

Conventions

Symbol

Meaning

  

NOTE

: Provides general information.

CAUTION

: Provides information to prevent damage to equipment.

WARNING:

 Indicates the presence of a hazard that can cause

personal injury if the hazard is not avoided.

NOTE

: You may lose data if you have not backed up your

system.  If you do not wish to install this kit yourself, contact
Digital Customer Service.  For a nominal fee, a Customer
Service Technician can install it for you.

Содержание Prioris XL 5166

Страница 1: ...Prioris XL and XLDP Server Powergrade Kit Installation Guide Order Number ER PC97U IA D01 Digital Equipment Corporation...

Страница 2: ...ce will not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user i...

Страница 3: ...BIOS 5 Reset Jumpers on the Main Logic Board 6 Powergrade Installation 6 Remove the CPU Module 6 Install a Second CPU Chip Kits FR PC97U AA AF Only 8 Install the Secondary Cache 9 Check the Jumper Se...

Страница 4: ...ntents 2 Table 2 CPU Module Jumper Settings 10 Conventions Symbol Meaning NOTE Provides general information CAUTION Provides information to prevent damage to equipment WARNING Indicates the presence o...

Страница 5: ...PU 1 166 MHz 2 166 MHz 1 200 MHz 2 200 MHz Installing this Powergrade kit involves updating your system BIOS Basic Input Output System To do this you will need to remove any video option card if insta...

Страница 6: ...its are used when a Main Logic Board 54 23456 does not meet upgrade specifications in which case a new MLB 54 23984 01 is included in the kit which requires Digital MCS installation Enable the Onboard...

Страница 7: ...hardware and booting the operating system when the computer is turned on You must install the new BIOS before installing your Powergrade kit Power Down the Server 1 Turn off your server 2 Disconnect a...

Страница 8: ...er Settings Make sure that the following jumpers are installed J17 Figure 1 Onboard VGA Enabled On J41 BIOS upgrade Enabled On J50 Boot block writable Move jumper from the default pins 1 and 2 to pins...

Страница 9: ...e A cd upgrade 3 At the MS DOS prompt type upgrade NOTE You must have an MS DOS formatted diskette for the current BIOS and for the upgrade BIOS 4 At the menu select Make Recovery Diskette From Flash...

Страница 10: ...block update Move the jumper back to the default position shown in Figure 1 pin 1 to pin 2 Powergrade Installation Remove the CPU Module 1 Place the antistatic wrist strap on your wrist and connect th...

Страница 11: ...PriorisXLandXLDPServerPowergradeKit 7 DEC00243 2 Figure 2 Removing the CPU Module...

Страница 12: ...ing CPU module from a single processor to a dual processor kit FR PC97U AA or AF install the new Pentium Processor chip as follows 1 Unlatch and lift up on the release lever 2 Install the CPU chip Fig...

Страница 13: ...Move the secondary cache if present on the old CPU module to the new CPU module Kits FR PC97U AB AG and AJ only Kits FR PC97U AA AC AD AE AF and AH have a new 512 KB cache module Seat the cache firmly...

Страница 14: ...o they are set correctly for the correct speed of the CPU you are installing Table 2 CPU Module Jumper Settings Bus Speed CPU Speed 66 MHz 166 MHz 200 MHz Pipeline Jumper J2 J4 J11 J4 J11 J8 Setting P...

Страница 15: ...le onto the voltage regulator pins on the CPU module B and C in Figure 5 Install the CPU Module 1 Install the CPU module into the dedicated CPU slot on the main logic board 2 Secure the CPU module to...

Страница 16: ...ion Utility SCU The SCU enables you to check or change your server s configuration Run the SCU to configure your server for the new CPU chip or module To start and run the SCU 1 Insert the SCU diskett...

Страница 17: ...st remove any video option card and enable the onboard VGA 1 Turn off the server and make sure that the Onboard VGA jumper J17 Figure 1 is installed enabled 2 Install a jumper on J39 Figure 1 to set i...

Отзывы: