Digisol DG-CS4616F Скачать руководство пользователя страница 15

DG-CS4616F Installation Guide

Chapter 2-9

examined.

Caution!
Please verify the sign above the port to ensure using the right port. Connecting to wrong
ports might damage the switch.

Fiber cables should be connected as below:
Step 1: remove the protective plug from the SFP/SFP+ fiber transceiver bore; Remove the
protective cap from one end of the fiber cable. Keep the fiber end clean and neat.
Step 2: Attach one end of the fiber cable to the SFP/SFP+ transceiver, and attach the
other end to the transceiver of the other devices. Note: SFP/SFP+ transceiver’s TX port
should be connected to RX port of other device, and SFP/SFP+ transceiver’s RX port
should be connected to TX port of other device.
Step 3: Check the fiber port status indicator, a light LED indicates that the link has been
established; otherwise the link is not ready and should be examined.

Caution!
Please verify the sign above the port to ensure using the other ports. Connecting to wrong
ports might damage the transceiver or the other ports. When connecting other devices
through a fiber cable to the switch, the output power of the fiber cable must not exceed the
maximum received power of the corresponding modules. Otherwise, it will damage the
fiber transceiver. Do not stare at the fiber bore when the switch is in operation. That may
hurt your eyes.

2.3.5 Power Supply Connection

DG-CS4616F uses 220V AC power. Please read the power input specification for the

detailed information.

Power supply connection procedure is described as below:

Содержание DG-CS4616F

Страница 1: ...DG CS4616F GIGA LAYER 3 SWITCH Installation Guide V1 0 2018 01 30 As our products undergo continuous development the specifications are subject to change without prior notice...

Страница 2: ...ardware Installation 1 2 1 Installation Notice 1 2 1 1 Environmental Requirements 1 2 1 2 Installation Notice 4 2 1 3 Security Warnings 5 2 2 Installation Preparation 6 2 2 1 Verify the Package Conten...

Страница 3: ...e of campus networks enterprise networks and IP metropolitan networks DG CS4616F is also used in the Internet bar as the full 10Gb convergence device 1 2 Physical Specifications Management Port 1 RJ 4...

Страница 4: ...USB interface and 19 LEDs The front panel of DG CS4616F is shown below Fig 1 2 Front Panel of DG CS4616F 1 3 2 Back Panel The back panel of DG CS4616F is shown below there is a fan 1 220V AC power so...

Страница 5: ...send data Off ports are not in link 1 3 3 2 System Status Indication Description Fig 1 5 DG CS4616F diagram Table 1 2 system indication description Panel Symbol Status Description PWR On Green The in...

Страница 6: ...SMF 10km or MMF 550m SFP LX 20 L transceiver 1310nm light waves 9 125um single mode fiber 20km SFP LX 40 transceiver 9 125um single mode fiber 40km SFP LH 70 L transceiver 9 125um single mode fiber 70...

Страница 7: ...DC power 48 60VDC 2 5A The switch must be well grounded in order to avoid ESD damage and physical injury of people The switch should avoid the sunlight perpendicular incidence Keep the switch away fr...

Страница 8: ...egradation or even electric leakage degradation of mechanical properties and corrosion of internal components Extreme low relative humidity may cause the insulation spacer to contract making the faste...

Страница 9: ...powering on the power supply please check the power input to ensure proper grounding of the power supply system The input source for the switch should be reliable and secure a voltage adaptor can be u...

Страница 10: ...he rack will generate heat during operation therefore vent and fans must be provided for an enclosed rack and devices should not be stacked closely When mounting devices in an open rack care should be...

Страница 11: ...e overload and leakage protection Inspect and maintain the site and the switch regularly Have the emergence power switch on the site In case of emergence switch off the power immediately Class A ITE i...

Страница 12: ...tact your dealer as soon as possible 2 2 2 Required Tools and Utilities The required tools and utilities are shown below Cross screwdrivers Flat blade screwdriver ESD wrist strap Antistatic uniform Ca...

Страница 13: ...tch for good air circulation Fig 2 2 Fasten the Switch to the Rack Caution The brackets are used to fix the switch on the rack They can t serve as a bearing Please place a rack shelf under the switch...

Страница 14: ...he guide rail inside the fiber interface line card Do not put the SFP SFP transceiver up side down Step 3 Push the SFP SFP transceiver along the guide rail gently until you feel the transceiver snap i...

Страница 15: ...e connected to TX port of other device Step 3 Check the fiber port status indicator a light LED indicates that the link has been established otherwise the link is not ready and should be examined Caut...

Страница 16: ...on The input voltage must be within the required range otherwise the switch can be damaged or malfunction Do not open the switch shell without permission It can cause physical injury 2 3 6 Ground Cabl...

Страница 17: ...to the off position Step 2 Use the screwdriver to turn the screws on the earth ground screw point Step 3 Strip one end of the ground wire to the ground hole of system Step 4 Connect the other end of t...

Отзывы: