Digisol DG-CS4616F Скачать руководство пользователя страница 14

DG-CS4616F Installation Guide

Chapter 2-8

Fig 2- 3 Connecting Console to switch

The connection procedure is listed below:
1. Find the console cable provided in the accessory kit. Attach the RJ45 end to console

port of the switch.

2. Connect the other side of the console cable to a character terminal (PC).
3. Power on the switch and the character terminal. Configure the switch through the

character terminal.

2.3.3 SFP/SFP+ Transceiver Installation

DG-CS4616F has multiple 10Gb interfaces and provides multiple 1000Mb SFP or 10Gb
SFP+ transceiver slots.
The procedure for installing the SFP/SFP+ transceiver is shown below:
Step 1: Put on a ESD wrist strap (or antistatic gloves)
Step 2: Insert the SFP/SFP+ transceiver to the guide rail inside the fiber interface line card.
Do not put the SFP/SFP+ transceiver up-side-down.
Step 3: Push the SFP/SFP+ transceiver along the guide rail gently until you feel the
transceiver snap into place at the bottom of the line card.
Note: the SFP/SFP+ transceiver is hot swappable.

Caution!
Do not stare directly at the 2 fiber bore in the SFP/SFP+ transceiver when the switch is in
operation, otherwise the laser may hurt your eyes.

2.3.4 Copper Cable/Fiber Cable Connection

Copper cables should be connected as below:

Step 1: Insert one end of the Ethernet cable to the RJ-45 Ethernet port in the switch
copper cable line card;
Step 2: Insert the other end of the Ethernet cable to the RJ-45 Ethernet port of some other
device;
Step 3: Check all status indicators for the corresponding ports; a lighted LED indicates
that the link has been established, otherwise the link is not ready and the cable should be

Содержание DG-CS4616F

Страница 1: ...DG CS4616F GIGA LAYER 3 SWITCH Installation Guide V1 0 2018 01 30 As our products undergo continuous development the specifications are subject to change without prior notice...

Страница 2: ...ardware Installation 1 2 1 Installation Notice 1 2 1 1 Environmental Requirements 1 2 1 2 Installation Notice 4 2 1 3 Security Warnings 5 2 2 Installation Preparation 6 2 2 1 Verify the Package Conten...

Страница 3: ...e of campus networks enterprise networks and IP metropolitan networks DG CS4616F is also used in the Internet bar as the full 10Gb convergence device 1 2 Physical Specifications Management Port 1 RJ 4...

Страница 4: ...USB interface and 19 LEDs The front panel of DG CS4616F is shown below Fig 1 2 Front Panel of DG CS4616F 1 3 2 Back Panel The back panel of DG CS4616F is shown below there is a fan 1 220V AC power so...

Страница 5: ...send data Off ports are not in link 1 3 3 2 System Status Indication Description Fig 1 5 DG CS4616F diagram Table 1 2 system indication description Panel Symbol Status Description PWR On Green The in...

Страница 6: ...SMF 10km or MMF 550m SFP LX 20 L transceiver 1310nm light waves 9 125um single mode fiber 20km SFP LX 40 transceiver 9 125um single mode fiber 40km SFP LH 70 L transceiver 9 125um single mode fiber 70...

Страница 7: ...DC power 48 60VDC 2 5A The switch must be well grounded in order to avoid ESD damage and physical injury of people The switch should avoid the sunlight perpendicular incidence Keep the switch away fr...

Страница 8: ...egradation or even electric leakage degradation of mechanical properties and corrosion of internal components Extreme low relative humidity may cause the insulation spacer to contract making the faste...

Страница 9: ...powering on the power supply please check the power input to ensure proper grounding of the power supply system The input source for the switch should be reliable and secure a voltage adaptor can be u...

Страница 10: ...he rack will generate heat during operation therefore vent and fans must be provided for an enclosed rack and devices should not be stacked closely When mounting devices in an open rack care should be...

Страница 11: ...e overload and leakage protection Inspect and maintain the site and the switch regularly Have the emergence power switch on the site In case of emergence switch off the power immediately Class A ITE i...

Страница 12: ...tact your dealer as soon as possible 2 2 2 Required Tools and Utilities The required tools and utilities are shown below Cross screwdrivers Flat blade screwdriver ESD wrist strap Antistatic uniform Ca...

Страница 13: ...tch for good air circulation Fig 2 2 Fasten the Switch to the Rack Caution The brackets are used to fix the switch on the rack They can t serve as a bearing Please place a rack shelf under the switch...

Страница 14: ...he guide rail inside the fiber interface line card Do not put the SFP SFP transceiver up side down Step 3 Push the SFP SFP transceiver along the guide rail gently until you feel the transceiver snap i...

Страница 15: ...e connected to TX port of other device Step 3 Check the fiber port status indicator a light LED indicates that the link has been established otherwise the link is not ready and should be examined Caut...

Страница 16: ...on The input voltage must be within the required range otherwise the switch can be damaged or malfunction Do not open the switch shell without permission It can cause physical injury 2 3 6 Ground Cabl...

Страница 17: ...to the off position Step 2 Use the screwdriver to turn the screws on the earth ground screw point Step 3 Strip one end of the ground wire to the ground hole of system Step 4 Connect the other end of t...

Отзывы: