Emergency
Procedures
DA 40 AFM
Page 3 - 2
Rev. 8
01-Dec-2010
Doc. # 6.01.01-E
3.7
OTHER EMERGENCIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-34
3.7.1 ICING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-34
3.7.2 FAILURES IN THE ELECTRICAL SYSTEM . . . . . . . . . . . . 3-35
3.7.3 SUSPICION OF CARBON MONOXIDE CONTAMINATION IN THE
CABIN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-39
3.7.4 'DOOR'-WARNING LIGHT ON . . . . . . . . . . . . . . . . . . . . . . 3-40
3.7.5 EMERGENCY EXIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-41
NOTE
Procedures for uncritical system faults are given in Chapter
4B - ABNORMAL OPERATING PROCEDURES.
Содержание DA 40
Страница 1: ......
Страница 37: ...DA 40 AFM General Doc 6 01 01 E Rev 8 01 Dec 2010 Page 1 21 1 7 THREE VIEW DRAWING ...
Страница 116: ...Emergency Procedures DA 40 AFM Page 3 42 Rev 8 01 Dec 2010 Doc 6 01 01 E Intentionally left blank ...
Страница 182: ...Performance DA 40 AFM Page 5 12 Rev 8 01 Dec 2010 Doc 6 01 01 E ...
Страница 184: ...Performance DA 40 AFM Page 5 14 Rev 8 01 Dec 2010 Doc 6 01 01 E ...
Страница 186: ...Performance DA 40 AFM Page 5 16 Rev 8 01 Dec 2010 Doc 6 01 01 E ...
Страница 190: ...Performance DA 40 AFM Page 5 20 Rev 8 01 Dec 2010 Doc 6 01 01 E ...
Страница 209: ...DA 40 AFM Mass Balance Doc 6 01 01 E Rev 8 01 Dec 2010 Page 6 15 2486 3060 3108 2600 6 4 5 PERMISSIBLE MOMENT RANGE ...
Страница 226: ...DA 40 AFM Mass and Balance Doc No 6 01 01 E Rev 8 01 Dec 2010 Page 6 32 Intentionally left blank ...
Страница 288: ...Handling DA 40 AFM Page 8 6 Rev 8 01 Dec 2010 Doc 6 01 01 E ...