P R O L Y T E
A N A L Y Z E R
3.m Pump Motor Removal
1.
Remove the pump tubing from the front of the analyzer.
2.
Detach the four screws from the front of the analyzer, using a Phillips head screw driver or 1.5
Hex as applicable. See Figure P12.
3.
Remove the pump motor assembly, as shown in Figure P13.
3.n
Pump Motor Installation
1.
Install the pump motor assembly through the front housing, as shown in Figure P13. The pump
motor wires are positioned below the pump when properly aligned.
2.
Attach the four screws into the front of the analyzer, using a Phillips head screw driver. See Figure
P12.
3.
Using a tie wrap cable, secure the loose wires under the pump motor to the lead screw/probe
motor wires and the sensor wires.
4.
Install the pump tubing.
30
Содержание Prolyte
Страница 1: ......
Страница 23: ...P R O L Y T E A N A L Y Z E R 20 Figure P5 Rear Housing Removal Cont...
Страница 26: ...P R O L Y T E A N A L Y Z E R Printer Bay 23 Figure P7 Printer Removal Installation...
Страница 27: ...P R O L Y T E A N A L Y Z E R Printer Connection Figure P8 Printer Removal Installation 24...
Страница 29: ...P R O L Y T E A N A L Y Z E R Figure P9 CPU Board Removal Installation 26...
Страница 31: ...P R O L Y T E A N A L Y Z E R Figure P10 Display Removal Installation 28...
Страница 32: ...P R O L Y T E A N A L Y Z E R Figure P11 Display Removal Installation 29...
Страница 37: ...P R O L Y T E A N A L Y Z E R Figure P14 Probe Motor Removal Installation 34...
Страница 39: ...P R O L Y T E A N A L Y Z E R 36 Figure P15 Guide Rod Removal Installation...
Страница 41: ...P R O L Y T E A N A L Y Z E R Removal Installation Figure P16 Electrode Jack 38...