12
Step 4
4.1
Pre assemble
❷
in
C;
4.2
Hang
S
and
T
located on part
B
onto
pre-assembled
❷
, as illustrated below.
Do not completely tighten the bolts in this
step as you need to assemble the middle
stretcher
F
in the next step.
X 12
C
C
C
B
T
B
T
B
B
C
C
T
4.1
4.2
2
Leave half of the thread exposed
!