
61
2
Hardware Installation
Panel Power Select
JP8
3-4 On: +5V
1
3
5
2
4
6
1
3
5
2
4
6
5-6 On: +3.3V
(default)
1-2 On: +12V
1
3
5
2
4
6
JP8 is used to select the power supplied to the LCD panel.
Important:
Before powering-on the system, make sure JP8’s setting matches the
LCD panel’s speci
fi
cation. Selecting the incorrect voltage will seriously
damage the LCD panel.
Jumper Settings
Содержание SB630-CRM
Страница 1: ...SB630 CRM System Board User s Manual A18530216 ...
Страница 37: ...37 2 Hardware Installation PS 2 keyboard port PS 2 mouse port Connect to the board s PS 2 port ...
Страница 100: ...100 4 Supported Software 3 Click Exit ...
Страница 111: ...111 4 Supported Software 4 Click Install to begin the installation 5 After completing installa tion click Finish ...
Страница 122: ...122 4 Supported Software 7 Click Install 8 The setup program is cur rently installing the driver 9 Click Finish ...
Страница 125: ...125 4 Supported Software 4 Click Install 5 The setup program is cur rently installing the soft ware 6 Click Finish ...
Страница 131: ...131 5 RAID 8 Click Yes I want to restart my computer now then click Finish ...