background image

- 40 -

Error code

Description

Ongrid - Three Phase

F25

DC feedback fault

Hardly appear the code. Never ever happened so far

.

F27

DC end insula�on error

Hardly appear the code. Never ever happened so far

.

F28

Inverter 1 DC high fault

Hardly appear the code. Never ever happened so far

.

F29

AC load switch failure

Hardly appear the code. Never ever happened so far

.

F32

Inverter 2 dc high fault

Hardly appear the code. Never ever happened so far

.

F33

AC over current

Hardly appear the code. Never ever happened so far

.

F34

AC current over load

Hardly appear the code. Never ever happened so far

.

F36

AC grid phase error

Hardly appear the code. Never ever happened so far

.

F26

The DC busbar is unbalanced

1. Check whether the 'BUSN' cable or driver board power supply

    cable is loose.

2. Restart the inverter, if the fault s�ll exists, contact your 

    installer or Deye service.

F31

Dc boost so� start

1. At least one Relay can't be closed. Check relays and its driver 

    signal. (Old inverter not have relays detec�on func�on)

2. Restart the inverter, if the fault s�ll exists, contact your 

    installer or Deye service.

F35

No AC grid

1. Check AC grid voltage. Check AC voltage detec�on circuit. 

    Check if the AC connector in good condi�on. Check whether 

    the AC grid is normal in voltage.

2. Restart the inverter, if the fault s�ll exists, contact your 

    installer or Deye service.

F30

AC main contactor failure

1. Check relays and AC voltage of relays. 

2. 

Check relays driver circuit. Check if the so�ware is not suitable 

    for this inverter. (Old inverter not have relays detec�on 

    func�on)

3. Restart the inverter, if the fault s�ll exists, contact your 

    installer or Deye service.

F23

AC leakage current is transient 

over current

1. This fault means the leakage current is above 30mA suddenly. 

    Check whether DC power supply or solar panels is ok, then 

    check 'Test data'-> 'diL'value is about 40; Then check the 

    leakage current sensor or circuit. Check test data needs 

    using big LCD.

2. 

Restart the inverter, if the fault s�ll exists, contact your installer 

    or Deye service.

F24

DC insula�on impedance failure

1. Check Vpe resistance on main board or detec�on on control 

    board. Check PV panels is OK. Many �mes this issue is the PV 

    problem. 

2. Check whether the PV panel (aluminum frame) is grounded 

    well and inverter is grounded well. Open the cover of inverter 

    

and then check the inside ground cable is fixed well on the shell.

3. 

Check if the AC/DC cable, terminal block are shorted to ground 

    or the insula�on is damaged.

4. 

Restart the inverter, if the fault s�ll exists, contact your installer 

    or Deye service.

F37

AC three-phase voltage unbalance 

failure

Hardly appear the code. Never ever happened so far.

F38

AC three-phase current unbalance 

failure

Hardly appear the code. Never ever happened so far.

F22

Contact your installer for help.

Crash stop (if there is a stop 

bu�on)

F21

Hardly appear the code. Never ever happened so far.

DC leakage flow fault

Содержание SUN-30K-G03

Страница 1: ...R Grid tied PV String Inverter User Manual ...

Страница 2: ...rt up the inverter 6 2 Shut off the inverter 1 1 2 3 3 3 4 5 5 5 6 6 7 7 9 10 11 11 13 18 18 18 16 7 Limiter function 19 7 1 Limiter function wiring diagram 7 2 Connect the limiter to inverter 19 20 26 38 38 23 7 4 Zero export function Option 7 3 Debugging Limiter 24 8 1 The initial interface 8 2 Statistics information 26 29 8 3 Fault Record 8 4 ON OFF setting 31 32 8 5 Parameter setting 33 8 Gene...

Страница 3: ...ic 1 2 Bo om view About This Manual The manual mainly describes the product informa on guidelines for installa on opera on and maintenance The manual cannot include complete informa on about the photovoltaic PV system How to Use This Manual Read the manual and other related documents before performing any opera on on the inverter Documents must be stored carefully and be available at all mes Conte...

Страница 4: ...rid ed PV String Inverter x 1 DC power connectors including Inserted spring 30Kw 33Kw 35Kw x 8 pairs 40Kw 45kw x 9 pairs 50Kw x 12 pairs Stainless steel an collision bolt M6 80 x 4 Wrench x 1 User manual User manual x 1 Installa on screws M5 12 x 8 SUN limiter op onal x 1 Sensor Clamp op onal x 3 Meter op onal x 1 Datalogger op onal x 1 Three Phase Smart Meter SET ESC 19 20 ...

Страница 5: ...ruc ons which if not correctly followed could result in burns Safety Hint Note symbol indicates important safety instruc ons which if not correctly followed could result in some damage or the destruc on of the inverter Warning Warning symbol indicates important safety instruc ons which if not correctly followed could result in serious injury or death Shock Hazard Prohibit disassembling inverter ca...

Страница 6: ...3 Local temperature of the inverter may exceed 60 while under opera ng Do not touch to avoid ge ng injured 4 All electrical installa on must be in accordance with local electrical standards and achieved permission of local power company 5 Please take appropriate an sta c measure 6 Please install where children can not touch Shock Hazard When PV module is exposed to sunlight the output will generat...

Страница 7: ... panel of the inverter Please see table 3 1 for details Explanation Inverter detects DC input Low DC input voltage Grid Connected Grid Unavailable Under normal opera ng Stop opera ng Detected faults or report faults Under normal opera ng Indicator status DC AC NORMAL ALARM on off on off on off on off Table 3 1 Status indicator lights AC DC Alarm Normal ...

Страница 8: ... ESC Right is Enter bu on ENTER Achieving below func ons by the four bu ons Page turning use UP and DOWN bu on Modify adjustable parameters use ESC and ENTER bu on Three phase string inverter use 256 128 dot forma on display Display below content Inverter opera on status and informa on Opera ng informa on Warning message and malfunc on display Esc Up Down Enter ...

Страница 9: ...reely To avoid overhea ng always make sure the flow of air around the inverter is not blocked Exposure to direct sunlight will increase the opera onal temperature of the inverter and may cause output power limi ng It is recommended that inverter installed to avoid direct sunlight or raining To avoid overhea ng ambient air temperature must be considered when choosing the inverter installa on loca on...

Страница 10: ...ne inverter must leave at least 500mm gap between each inverter And each inverter must be at least 500mm above and below And must install the inverter at the place where children cannot touch Please see picture 4 3 Consider whether the installa on environment is helpful to see the inverter LCD display and indicator status clearly Must offer a ven late environment if inverter installed in the air gh...

Страница 11: ...Pic 4 4 Mou ng bracket dimensions 500mm 500mm 09 4 2 Inverter of inverter Pic 4 3 Installa on Gap ...

Страница 12: ...e mounted in a ver cal posi on The steps of moun ng are as follows 1 For brick walls the posi on of the holes should be suitable for the expansion bolts 2 Make sure the bracket is horizontal and the moun ng holes are in the correct points Drilling the holes on the wall according the marks 3 Using the expansion bolts to fix the bracket to the wall ...

Страница 13: ...se serious damages to the inverter Safety Hint Before connec ng inverter please make sure the PV array open circuit voltage is within the 1000V of the inverter Safety Hint Before connec on please make sure the polarity of the output voltage of PV array matches the DC and DC symbols Safety Hint Please use approved DC cable for PV system Pic 5 1 DC connector MC4 Pic 5 2 DC connector MC4 Cable type R...

Страница 14: ... 3 b Crimping metal terminals with crimping pliers as shown in picture 5 4 c Insert the contact pin to the top part of the connector and screw up the cap nut to the top part of the connector as shown in picture 5 5 Pic 5 3 Disassemble the connector cap nut 7mm 7mm Pic 5 4 Crimp the contact pin to the wire Pic 5 5 connector with cap nut screwed on ...

Страница 15: ...ondi ons Recommended 27 Conductor cross sectional area mm Recommended number Range Range 22 32 Cable specifications Copper cladaluminum Aluminum alloy cable Copper core cable 25 35 16 25 35 25 2 Cable outside diameter mm Table 5 2 Recommened cable specifica ons 5 2 AC input terminal connec on AC connec on can use 16 25mm 105 cable please make sure the resistance of cable is lower than 1 5ohm If the...

Страница 16: ... 5 8 2 Connect the cable through the junc on box waterproof jacket and insert into the terminal The picture shows the connec on mode of three phase lines connected to the junc on box ground wire screwed on the inverter shell Pic5 9 and use hexagon screwdriver to presses the wiring harness to the connect terminal as shown in Pic5 10 Pic 5 7 AC junc on box Pic 5 8 AC terminal 14 Pic 5 9 AC cable con...

Страница 17: ... 3 Recommended current protector specifica ons Pic 5 11 Tighten the AC junc on box Table 5 3 Recommended current protector specifica ons Inverter SUN 30K G03 SUN 33K G03 SUN 35K G03 SUN 40K G03 SUN 45K G03 Rated voltage 400 400 400 400 400 Rated output power KW 30 33 35 40 40 Current protection device A 60 70 80 80 SUN 50K G03 400 50 100 80 15 ...

Страница 18: ...ground line Inverter has the func on of wireless remote monitoring inverter The inverter has Wifi func on and Wifi Plug in the accessories is used to realize the connec on between the inverter and the network The opera on installa on networking APP download are detailed in the WIFI PLUG instruc ons Figure 5 13 is the Internet monitoring solu on 5 4 Inverter monitoring connec on 5 12 The installa on ...

Страница 19: ...Insert the datalogger into the interface and fix it with a screw The configura on of the datalogger needs to be performed a er various electrical connec ons have been completed and the inverter DC power on When the inverter is on the DC power it is determined whether the datalogger is normally electrified The LED light shines out of the shell 5 4 1 Installa on of datalogger Pic 5 13 Internet monitori...

Страница 20: ...ow steps 1 First switch on the AC breaker 2 Turn on the DC switch of the PV module and if the panel provides sufficient star ng voltage and power the inverter will start 3 When the AC voltage and DC voltage are normal the inverter start up is ready to begin The inverter will first check the internal parameters and the grid parameters while the liquid crystal will show that the inverter is self checki...

Страница 21: ...hree sets of current sensor and one set of control terminals SUN limiter will collect voltage and current from these interfaces and send control signals to the inverter L1 L1 L L1 K L2 L L2 K L3 L L3 K L2 L3 N 20 19 7 Zero export func on via SUN limiter 7 1 SUN Limiter func on wiring diagram Pic 7 1 SUN Limiter view When you are reading this we believe that you have completed the connec on accordi...

Страница 22: ... of electric shock Choose one wire from the bo om of the three phase DC switch any phase of U V W to connect with L1 terminal then ghten the line with a screwdriver 2 Connect SUN limiter to clamp senor Clamp senor can measure the current of the AC side it should be connected to the front side of the load domes c appliance ect to achieve this func on Only when the SUN limiter collects the voltage a...

Страница 23: ...ect the control line There are two numbers 1 and 2 on the interface of SUN limiter and the same on the waterproof terminal of the inverter Twist the waterproof terminal and connect the red line to number 1 and black line to number 2 shown as the picture A er that connect the terminal to the interface of the SUN limiter The other side of the line should be connected to the control terminal Load ...

Страница 24: ...Pic 7 5 Waterproof terminal Pic 7 6 Connect SUN limiter to inverter Pic 7 7 Connect terminal to inverter 1 2 limiter 1 2 22 ...

Страница 25: ...verter according to the average of the total power of the three phase load which may cause single backflow The controller is produced in the minimum mode to ensure no an backflow happens to the customers Pic 7 8 Zero export func on via SUN limiter se ng interface 7 3 Debugging SUN Limiter Turn on the an backflow func on of the inverter refer to the manual then turn on the SUN limiter s power supply n...

Страница 26: ... according to the requirements of chapter 5 if you have been running your inverter at this me and you want to use the zero export func on please turn off AC and DC switch of the inverter and wait for 5 minutes un l the inverter completely discharged Please follow below Picture 7 9 to connect the energy meter For system wiring diagram the red line refers to L line L1 L2 L3 the black line refers to t...

Страница 27: ...mmunication 1 2 VCC_5V 485_A 485_B GND 3 4 Family load Three Phase Smart Meter SET ESC L1 L2 L3 N L1 L2 L3 N Pic 7 8 Zero export func on via energy meter 7 4 2 Debugging energy meter Turn on the an backflow func on of the inverter refer to the manual next close the DC switch and last turn on the inverter MENU Setup Run Param OK Cancel ActiveP 100 ReactiveP 0 0 PF 1 000 Fun_ISO OFF Fun_RCD OFF SelfC...

Страница 28: ...o see the current DC voltage DC current AC voltage AC current inverter radiator temperature so ware version number and Wifi connec on state of the inverter 8 General Opera on 26 System param Running param Protection param Comm param E Month E Day E Year E History Test Data Start Statistics Fault Record ON OFF Setup PV LCD main menu AC output data Interface DC input data Pic 8 1 LCD opera on flow cha...

Страница 29: ...informa on Press UP or Down you can check inverter DC voltage DC current AC voltage AC current inverter temperature so ware version informa on You can check the PV informa on the number of strings input MPPT voltage and MPPT current Power Day Total State Standby 0 29 86Kw P 45 Kw 295kWh 25 MWh 6 12 18 24 ID 1601012001 0 0Kw SN 01 2019 05 11 08 00 00 27 PV1 V 0 0V I 0 0A RUN Input ...

Страница 30: ...ack spot in the bo om right corner The first flash means inverter is communica ng with LCD The second flash means LCD is communica ng with wifi plug Ua 234 5V Ia 0 0A Grid Freq 50 00Hz RUN Grid Pic 8 4 Inverter firmware version Pic 8 5 Meter power and load power Ver 0166 Ver 1860 RUN Meter Power 0W Load Power 0W Day Total ImpEp 0 00kWh 0 00kWh ExpEp 0 00kWh 0 00kWh LoadEp 0 00kWh 0 00kWh PARAMETR Meter...

Страница 31: ...Main Menu 8 2 Sta s cs informa on Pic 8 5 Main Menu Pic 8 6 Sta s cs There are five submenu in the sta s cs Into each submenu through cursor E Day E History E Month E Year Test Data MENU Statistics 29 Statistics Fault Record ON OFF Setup PV VA MENU ...

Страница 32: ...Month Pic 8 9 E Year 2019 04 1 10 20 31 MENU Statistics E Month 01 10MWh 02 03 04 05 06 07 08 09 10 2019 MENU Statistics E Year 01 200KWh 02 03 04 05 06 07 08 09 10 11 12 2019 05 11 MENU Statistics E Day 0 10MWh 6 12 18 24 30 ...

Страница 33: ...deal with it depends on the error code Pic 8 10 E History Pic 8 11Test Data PV1 PV2 HV GFD DiL AVL 126 1k2 19186 19198 19152 9119 36 2 287 6 1k3 1k4 1k5 1k6 vHV BSn ofA ofB 11126 11140 16666 2927 ofC 138 139 140 2057 2248 137 2145 1497 0 24362 12218 2065 2653 2015 2024 MENU Statistics E History 15 5KWh 16 17 18 19 20 21 22 23 24 31 ...

Страница 34: ...Record MENU Fault Record Fault F352019 05 05 08 38 F352019 05 05 08 37 F352019 04 24 18 47 F352019 04 24 17 54 F352019 04 24 17 53 1 2 3 4 History Pic 8 13 ON OFF se ng MENU ON OFF Turn ON Turn OFF Into each submenu through cursor 32 ...

Страница 35: ... ng includes system param run param protect param comm param All of these informa on for maintenance reference Pic 8 14 ON set MENU ON OFF Turn ON Turn ON OK Cancel Pic 8 15 OFF set MENU ON OFF Turn OFF Turn OFF OK Cancel 33 ...

Страница 36: ...set display set and factory date reset Pic 8 16 Se ng MENU Setup System Param Run Param Param Protect Param Comm Pic 8 17 System Param MENU Setup System Param Time Set Language Set Display Set Factory data reset Pic 8 18 System Param Time Set 2019 05 11 09 36 30 OK Cancel 34 ...

Страница 37: ...et 8 5 1 5 Factory data reset Pic 8 19 Lauguage set Pic 8 20 Display set Pic 8 21 Factory data reset set Display Set Brightness Delay Delay time 05S OK Cancel Factory data reset Confirm to reset Cancel 35 Lauguage Set 简体中文 English Angielski ...

Страница 38: ...don t need to reset it The password is same as 8 4 Running param Note Password required only for access authorized engineer Un authorized access may avoid the warranty The ini al password is 1234 MENU Setup Run Param OK Cancel ActiveP 100 ReactiveP 0 0 PF 1 000 Fun_ISO ON Fun_RCD ON SelfCheck 10S Island ON Meter OFF Limiter OFF E_Coef 0 00 Meter_CT 0 MPPT Num 3 ...

Страница 39: ... on param MENU Setup Comm Param Address 01 BaudRate 9600 37 Note Engineer only MENU Setup Protect Param OK Cancel INMETRO EN50949 EN50438 IEC61727 CUSTOM CUSTOM OK Cancel AC OverVoltage 270 0V AC LowVoltage 180 0V AC OverFreq 52 00Hz AC LowFreq 48 00Hz Rated Voltage 220 380V ...

Страница 40: ...ing energy into the grid The alarm descrip on and their corresponding alarm messages are listed Table 10 1 Warning When the device is running the local temperature is too high and the touch can cause burns Turn off the inverter and wait for it cooling then you can clean and maintain Warning No solvent abrasive materials or corrosive materials can be used for cleaning any parts of the inverter Inver...

Страница 41: ...rking mode changed Grid mode changed 1 Lost of one phase or AC voltage detec on circuit or relays not closed old inverter not have relays detec on func on 2 Restart the inverter if the error s ll exists please contact your installer or Deye service F20 DC over current fault of the hardware 1 Check whether solar panel output current is within the allowed range 2 Check DC current sensor and its dete...

Страница 42: ...0 AC main contactor failure 1 Check relays and AC voltage of relays 2 Check relays driver circuit Check if the so ware is not suitable for this inverter Old inverter not have relays detec on func on 3 Restart the inverter if the fault s ll exists contact your installer or Deye service F23 AC leakage current is transient over current 1 This fault means the leakage current is above 30mA suddenly Che...

Страница 43: ...tage protec on se ng And Check if the AC cable is too thin Check the voltage difference between LCD and meter F42 AC Line W U low voltage Check the AC voltage protec on se ng Check the voltage difference between LCD and meter Also need to check whether AC cables are all firmly and correctly connected F44 AC Line V W low voltage Check the AC voltage protec on se ng Check the voltage difference between ...

Страница 44: ...ature sensor Check if firmware is suitable for the hardware Check if the inverter is its right model 2 Restart the inverter if the fault s ll exists contact your installer or Deye service F59 AC grid V over current Hardly appear the code Never ever happened so far F60 AC grid W over current Hardly appear the code Never ever happened so far F61 Reactor A phase over current Hardly appear the code Nev...

Страница 45: ...op onal 98 7 98 250 1000 200 850 40 40 40 40 40 40 40 230 400 277 460 this may vary with grid standards 50 60 Op onal Three phase 0 8 leading to 0 8 lagging 2 Grid Current THD 647 5 537 303 5 Transformerless Size mm W H D 44 5 Weight kg Topology 1W Night Internal consump on 25 65 Opera ng temperature Ingress protec on IP65 45dB Smart cooling Max opera on al tude Cooling Concept Noise Emission Typi...

Страница 46: ...Add No 26 30 South Yongjiang Road Beilun 315806 Ningbo China Fax 86 0 574 8622 8852 Tel 86 0 574 8622 8957 E mail service deye com cn Web www deyeinverter com 502011957 Ver 1 0 2020 11 ...

Отзывы: