DeWalt DXST3000WB Скачать руководство пользователя страница 2

25 

27 

28 

29 

30 

26 

31 

32 

* Work Station 

Tools Required for Rack Assembly:

 4 mm Hex Key (included) OR 4 mm Hex Bit (included); Rubber 

Mallet (not included), Flat-Head Screwdriver (not included) 

READ ALL INSTRUCTIONS 

BEFORE YOU BEGIN: 

•  Read all instructions thoroughly. 
•  Remove all components from the box, and lay them on the floor in an orderly fashion. 
•  Wear eye protection. 
•  Be cautious of sharp edges. 
•  Keep this information for further reference. 

•  If you are not stacking a second rack at this time, then please store the Stacking Plates for potential 

future use as they will be needed. 

WARNING: 

Serious or fatal crushing injuries can occur from rack tipping over. To prevent this, the 

assembled rack must always be secured to a wall, especially in earthquake-prone environments, where 

surfaces are uneven, and where children and/or pets are present. 

Expandable Upright Frame Instructions (Fig. 1-2) 

NOTE: 

For ease of assembly, two (2) vertical beams feature pre-bolted horizontal and diagonal beams, as 

well as pre-attached U-bracket covers. 
1.  Place one (1) vertical beam and one (1) pre-bolted vertical beam on the floor, parallel to one another 

(about 18"/45.7 cm apart). The widest part of the teardrop-shaped hole pattern on each beam should 

be facing upward (or away from you). (Fig. 1) 

2.  There are two versions of the U-bracket covers - an “A” side and a “B” side. Before moving forward, 

cover the U-shaped brackets on the vertical beam with the covers by mirroring the covers on the pre-

bolted vertical assembly. 

3.  Insert the free end of the diagonal beam into the free end of the horizontal beam. Align the holes, and 

insert both beams into the U-shaped bracket at the top of the opposing vertical beam. Use the included 

hex key or drill bit to thread the vertical assembly bolt through the holes and into the weld nut attached 

to the U-shaped bracket. Do not fully tighten the bolt yet. (Fig. 2) 

4.  Swing out the bottom horizontal beam, and insert it into the U-shaped bracket at the bottom of the 

opposing vertical beam. Thread a vertical Assembly bolt through the holes and into the weld nut. Do not 

fully tighten the bolt. (Fig. 2) 

5.  Repeat Steps 1-4 to assemble the three remaining upright frames. Once all are assembled, fully tighten 

the bolts on all four corners. Be careful not to over-tighten the bolts; there should be no deformation of 

the U-shaped brackets and/or horizontal beams. 

FIG. 1 

FIG. 2 

TOP HORIZONTAL BEAM 

2 ft

18" 

(61 cm)

(45.7 CM) 

DIAGONAL 

BEAM 

Crossbeam Installation (Fig. 3-5) 

NOTE: 

It is recommended for one person to hold the upright frames in place while a second person installs 

the crossbeams. 
1.  There is a set of locking tabs at both ends of every crossbeam. To begin assembly, take one crossbeam 

and insert the tabs into two of the holes on the lower portion of one upright frame. Engage the locking 

tabs into the holes using a downward motion. The locking pin hole should be at the top. Make sure the 

end of the crossbeam is flush against the upright frame. (Fig. 3) 

2.  Repeat for the opposite side of the upright frame. Tap the ends of the crossbeam closest to the upright 

frames with a rubber mallet until fully seated. The crossbeam and locking tabs should easily slip into 

place. If they do not, then recheck the alignment of the teardrop-shaped holes and tabs. Too much 

force may damage the interlock between the crossbeam and upright frame. (Fig. 4) 

3.  Using the methods listed above, install another crossbeam to the opposite side of the upright frames, 

parallel to the first crossbeam you installed. Make sure both crossbeams are at the same level. 

4.  Repeat the previous steps for installing crossbeams spaced four slots from the top of the rack  

upright frames. (Fig. 5) 

FIG. 3 

FIG. 4 

FIG. 5 

LOCKING 

PIN HOLE 

Drawer Assembly (Fig. 6-9) 

NOTE:

This fold up drawer is designed to be placed under a shelf so that the shelf may act as the drawer top. 

1.  Open the fold up drawer and install the drawer pull by slipping it into the tabs on the inside of the fold 

up drawer front. Secure it using the provided drawer carriage bolt and nut in the top corners of the fold 

up drawer. Make sure the nuts are inside of the fold up drawer. (Fig. 6) 

2.  Using the remaining drawer carriage bolts and nuts, secure the top corners of the fold up drawer on the 

opposite side of the drawer pull. (Fig. 7) 

3. 

NOTE:

 Ensure that the drawer slides open to the front of the rack. 

   Install the mounting brackets with the drawer slides onto the rack with six slots spaced from the top 

of the vertical beams. This will be directly underneath the top set of crossbeams that were installed 

previously. This is done by positioning the mounting bracket with drawer slides on the inside edge of 

the rack uprights. Slide down the mounting bracket with drawer slides to seat them properly. Make 

sure both brackets are level with one another before proceeding. Then, the hardware on the mounting 

brackets can be tightened. (Fig. 8) 

4. 

NOTE:

 Ensure mounting brackets with drawer slides are level before installing the fold up drawer.  

Have a helper assist with the install of the fold up drawer onto the drawer slides. 

   Slide the guides on the fold up drawer into the rails on the mounting bracket: there should be a distinct 

click when the guides have seated properly. (Fig. 8) 

5.  To secure the brackets to the rack’s uprights, install the locking pins into the mounting bracket with 

drawer slides. (Fig. 9) 

FIG. 6 

FIG. 7 

FIG. 8 

REAR OF 

DRAWER 

DRAWER 

PULL 

FIG. 9 

MOUNTING 

HARDWARE 

Shelf Support and Safety Strap Instructions (Fig. 10-12) 

1.  Each set of crossbeams will need to have (3) shelf support straps and (2) safety straps installed. 
2.  Starting with the lowest set of crossbeams, place a safety strap between the lower ridges of the 

crossbeams where two sets of holes have been pre-drilled. Thread a safety strap bolt up through the 

bottom of the pre-drilled holes and through the weld nuts, and fully tighten with the included hex key or 

drill bit. Repeat this process for the second strap for this set of crossbeams. (Fig. 10) 

3.  For each set of crossbeams, place a shelf support strap perpendicular to the crossbeams, and insert 

each end into the slots on each ridge of the crossbeams. (Fig. 11) 

FIG. 10 

FIG. 11 

FIG. 12 

SAFETY STRAP WITH 

WELD NUT 

(UNDERNEATH) 

SHELF SUPPORT 

STRAP (ON TOP) 

Wall Mounting Instructions (Fig. 13-15)

  Drywall anchors and anchor screws are included with this rack; however, different wall materials require 

different types of fasteners. Use fasteners suitable for your specific type of wall. If you are uncertain about 

what type of fasteners to use, then please contact your local hardware store. 
1.  There is one wall mount bracket assembly to be used to secure the Work Station. Install the wall mount 

bracket assembly on the backside of the crossbeam right above the pull out drawer. 

2.  Take the U-shaped bracket and rock it up at an angle to attach it to the bottom inner channel of the 

crossbeam. Once attached, the back portion will sit flush against the inside of the crossbeam. (Fig. 13) 

3.  Once attached, the U-shaped bracket can be moved from side to side (in between the two safety 

straps). This allows for it to be attached to a 2 x 4 in the wall. (Fig. 14) 

4.  The L-shaped bracket has two sets of four square holes that allow you to adjust the distance of the 

rack to the wall. Use two carriage bolts and two 10 mm nuts to attach the L-shaped bracket to the 

bottom of the U-shaped bracket. (Fig. 15) 

BOTTOM HORIZONTAL BEAM 

Содержание DXST3000WB

Страница 1: ...es Estación de trabajo de estantería para almacenamiento industrial de 2 estantes GENERAL SAFETY Keep work area clean and dry Use correct recommended tools for the job Never leave unattended tools plugged in or running Never force a part into place Wear appropriate safety apparel for the job you are doing Wear safety glasses goggles Never crawl sit stand or climb on the rack pegboards or drawer Ne...

Страница 2: ...vious steps for installing crossbeams spaced four slots from the top of the rack upright frames Fig 5 FIG 3 FIG 4 FIG 5 LOCKING PIN HOLE Drawer Assembly Fig 6 9 NOTE This fold up drawer is designed to be placed under a shelf so that the shelf may act as the drawer top 1 Open the fold up drawer and install the drawer pull by slipping it into the tabs on the inside of the fold up drawer front Secure...

Страница 3: ...sition one right and one left bracket onto the top two mounting slots of each upright on one side of the rack with the hanging tab arrows pointing upwards Slide the side mounting brackets down completely into the slots to secure them For the bottom set of mounting brackets offset them one slot upwards from the bottom of the rack uprights then follow the same procedure as the top mounting brackets ...

Страница 4: ...ral 1 32 Porte outils pour panneau perforé 6 17 Plaque d empilement 2 3 2 4 1 5 6 7 8 10 9 11 12 14 13 16 15 17 20 18 19 21 22 23 24 25 27 28 29 30 26 31 32 Station de travail Outils requis pour l assemblage du support clé Allen de 4 mm inclus OU écrou hexagonal de 4 mm inclus maillet en caoutchouc non inclus tournevis à tête plate non inclus LIRE TOUTES LES CONSIGNES AVANT DE COMMENCER Veuillez l...

Страница 5: ...ère doit reposer à plat contre l intérieur de la traverse Fig 13 3 Une fois installée la fixation en U peut être déplacée d un côté à l autre entre les deux barres de sécurité Ceci permet de la fixer à une pièce de bois de deux pouces sur quatre pouces dans le mur Fig 14 4 La fixation en L comporte deux ensembles de quatre trous carrés permettant d ajuster la distance entre l étagère et le mur Uti...

Страница 6: ...san bajo licencia El gráfico de color negro y amarillo es una maca registrada para las herramientas eléctricas y los accesorios de DEWALT Definiciones Normas de seguridad Las siguientes definiciones describen el nivel de gravedad de cada palabra de señal Lea el manual y preste atención a estos símbolos ADVERTENCIA Indica una situación de peligro potencial que si no se evita podría provocar la muerto ...

Страница 7: ...avanzando cubra los soportes en U en la viga vertical con las cubiertas al reflejar las cubiertas en el conjunto vertical previamente atornillado 3 Tome el extremo libre de la viga diagonal e insértelo en el extremo libre de la viga horizontal superior Alinee los orificios e inserte ambas vigas en el soporte en U en la parte superior de la viga vertical opuesta Utilice la llave hexagonal o broca i...

Страница 8: ... asegurándose de que las flechas de la pestaña colgante apunten hacia arriba Deslice los soportes completamente hacia abajo en las ranuras para asegurarlos Coloque un segundo conjunto de soportes espaciados una ranura debajo de los previamente instalados nuevamente asegurándose de que las flechas apuntan hacia arriba y deslizándolos hacia abajo Fig 20 2 Deslice una viga de montaje de panel perfora...

Отзывы: