DEVIlink™ CC
Installation Guide
6
3
Installation plan
DEVI recommends that an installation plan is made
before beginning the actual installation.
1. Create an installation plan of all the room devices
(mains powered and battery powered).
2. Add the DEVIlink™ CC in a central location to the
installation plan.
3. Add necessary repeater units (if any) to the installation
plan. DEVI recommends that you include at least one
repeater unit within 5 meters from the CC.
3�1
Correct installation plan
• No metal objects between the DEVIlink™ CC and other
wireless DEVI units.
• The DEVIlink™ CC is installed as central as possible on the
floor plan (max. 30 m between devices in free space).
• Wireless signal through walls on shortest possible
diagonal distance.
!
RS Sensor
(room device)
DEVIlink™ HC
(service device)
DEVIlink™ CC
living connect
(room device)
living connect
(room device)
Содержание DEVIlink CC
Страница 1: ...Installation Guide DEVIlink CC Central Controller www DEVI com ...
Страница 34: ...DEVIlink CC Installation Guide 34 ...
Страница 36: ......