Dettson KLAVT0101DET Скачать руководство пользователя страница 5

 

5

l. 

Less  than  3'  (0.91  m)  from  an  inside  corner  of  an  "L"-
shaped structure; 

m.  So  that  the  bottom  of  the  vent  termination  opening  is 

less  than  1'  (0.30  m)    above  any  surface  that  may 
support ice, snow, or debris;  

n.  So  that  the  flue  gasses  are  directed  toward  brickwork, 

siding or other construction, in such a manner that they 
will  be  damaged  from  heat  or  condensation  from  flue 
gasses. 

 
 
 

 

 

CAUTION 

 

Most codes have a notwithstanding clause which states that 
products  of  combustion  shall  not  enter  the  dwelling  under 
any circumstances, even if all other code requirements as to 
construction  and  location  have  been  complied  with.  The 
installer  is  ultimately  responsible  to  do  whatever  is 
necessary  to  ensure  that  flue  gasses  do  not  enter  the 
dwelling.  

 

 

* For installations in the U.S.A. refer to Section 6.7.3.4 of 

the NFPA 31. 

 

Figure 2 : Components identification 

2.3 

INSTALLATION OF THE COMPONENTS 

 
Refer  to  Figure  2  for  additional  details  on  components 
identification. 
 
2.3.1 

Installing the terminal in the wall 

 
1.  Open up a 6" (15,24 cm) hole for the VTK-53A / VTK1, 

VTK-54A  /  VTK098  /  KLAVT0101DET  and  VTK-64A  / 
VTK2 terminals and a 6¼” (15,88 cm) hole for the

 

VTK-

65A  /  VTK3  /  KLAVT0201DET  terminal  in  the  wall  in 
accordance  with  the  location  considerations  outlined  in 
the previous section (2.2); 

2.  Fasten  the  wall  plate  to  the  inside-wall  using  4  field-

supplied  fasteners,  appropriate  for  the  wall  material. 

Note that the pressure control bracket (item G) must be 
removed  to  access  the  top  right  wall  plate  screw  hole 
(item E). Install the wall plate so that the top of the hole 
in the wall plate is positioned 1/8" (3.2 mm) higher than 
the top of the 6" (15,24 cm) hole in the wall, see Figure 
3.  This  will  ensure  the  proper  slope  of  the  terminal  for 
the proper evacuation from the inside to the outside; 

3.  Remove  the  3  screws  (item  C)  holding  the  end  cone 

(item A) in place and remove the cone; 

4.  Remove  the  4  screws  (item  C)  holding  the  stabiliser 

shroud  (item  B)  in  place  and  remove  the  stabiliser 
shroud; 

5.  Insert  the  main  body  of  the  terminal  through  the  wall 

plate  so  that  the  end  of  the  terminal  extends  about  2" 
(5.08 cm) past the outside wall, see Figure 3; 

Содержание KLAVT0101DET

Страница 1: ...inted in Canada Printed on 100 recycled paper INSTALLER SERVICE TECHNICIAN USE THE INFORMATION IN THIS MANUAL FOR THE INSTALLATION AND SERVICING OF THE FURNACE AND KEEP THE DOCUMENT NEAR THE UNIT FOR...

Страница 2: ...TALLATION OF THE BVSO JUMPER 9 3 0 OPERATION 9 3 1 COMBUSTION GAS TEMPERATURE VERIFICATION 9 3 2 BURNER POST PURGE DELAY ADJUSTMENT 9 4 0 MAINTENANCE 9 FIGURES Figure 1 Minimum clearance 4 Figure 2 Co...

Страница 3: ...t with water c Do not store gasoline or any other flammable substances such as paper carton etc near the furnace IMPORTANT All local and national code requirements governing the installation of oil bu...

Страница 4: ...e 2 2 1 Installation considerations The vent may be installed through a wall with a minimum thickness of 2 5 08 cm and a maximum thickness of 15 38 10 cm Select a location for the vent terminal in acc...

Страница 5: ...Installing the terminal in the wall 1 Open up a 6 15 24 cm hole for the VTK 53A VTK1 VTK 54A VTK098 KLAVT0101DET and VTK 64A VTK2 terminals and a 6 15 88 cm hole for the VTK 65A VTK3 KLAVT0201DET ter...

Страница 6: ...secure the back of the shroud to the wall Do not over tighten the screws or it will distort the stabiliser shroud The screws will not be necessary on a concrete or block wall as the mortar can provid...

Страница 7: ...ce on the furnace breech plate 5 The installation of the transition must be such that the port for pressure measurements is at the top and accessible once the installation is completed Do not install...

Страница 8: ...ransition bushings to go from PVC or ABS to ASTM D 2729 Septic Sewer Pipe if applicable If PVC fittings are mixed with ABS fittings use solvent cement that is approved for bonding the two plastics 2 4...

Страница 9: ...93 C 200 F In case it is impossible to obtain this temperature after 5 minutes of operation it is recommended to relocate the furnace in order to shorten the length of the vent pipe After the modific...

Страница 10: ...BF3 VTK 53A IFV 310A IFV 315A IFV 320A OHB64F AFII 150 R40 BF5 VTK 64A IFV 410A IFV 415A IFV 420A OLB53F AFII 85 R40 BF3 VTK 53A IFV 310A IFV 315A IFV 320A OLB53R AFII 85 R40 BF3 VTK 53A IFV 310A IFV...

Страница 11: ...11 Figure 12 Dimensions Figure 13 Wiring Diagram...

Страница 12: ...minal B03906 01 B03906 02 B03906 02 B03906 03 7 Pressure Gauge R99F033 R99F032 R99F032 R99F034 8 Connector with Port B03907 01 B03907 02 B03907 03 B03907 04 9A Insulated Flex Vent 10 long IFV 310A IFV...

Отзывы: